However, Interconnector Users must submit Physical Notifications, and any associated data as necessary, each day by 11:00 hours in respect of the next following Operational Day in order that the information used in relation to the capability of the respective External Interconnection is expressly provided.
BC1.4.6 Special Provisions relating to Interconnector Users (a) The total of the relevant Physical Notifications submitted by Interconnector Users in respect of any period of time should not exceed the capability (in MW) of the respective External Interconnection for that period of time.
For External Resources that are Developmental Resources or are Existing Resources that do not have the interconnection service necessary to receive the Minimum Required External Interconnection and Deliverability Service, Bidder must initiate the process and complete and submit to the applicable Balancing Authority the appropriate application(s), including the required supporting information, to receive such service.
Each Generator and each Interconnector Owner will provide NGET in writing with an update of the Final Generation Outage Programme and a best estimate weekly Output Usable forecast for each of its Gensets or its External Interconnection Circuits, as appropriate, from the 2nd week ahead to the 52nd week ahead.
Design Drawing External Interconnection Cable Project Manager Right of Way Working Drawing Terms used in this D&CP that are not defined have the meaning in the Acquirer’s FAA or CRA (as applicable).
External System In relation to an Externally Interconnected System Operator means the transmission or distribution system which it owns or operates which is located outside the National Electricity Transmission System Operator Area any Apparatus or Plant which connects that system to the External Interconnection and which is owned or operated by such Externally Interconnected System Operator.
AC/DC Converter Station An installation comprising one or more AC/DCConverters connecting an External Interconnection to the TRANSCO Transmission System or connecting a Wind Turbine Generating Unit or Photovoltaic Generating Unit or Power Farm to the TRANSCO Transmission System.
In the absence of any request to apply a specific rule for any BMU and data type, the first rule will be applied as a matter of course, i.e. D_PN_1, D_QPN_1, D_MEL_1 or D_MIL_1, unless it relates to an External Interconnection, in which case the second rule will in the absence of any such request apply.
System Operator will only instruct to De-Synchronise any Gensets within an Existing Magnox Reactor Plant or within an Existing AGR Plant (other than under (i) above) if the level of System NRAPM (taken together with System constraints) and/or Localised NRAPM is such that it is not possible to avoid De- Synchronising such Generating Unit, and provided the power flow across each External Interconnection is either at zero or results in an export of power from the Total System.
Externally Interconnected System Operator or EISOA person who operates an External System which is connected to the National Electricity Transmission System or a User System by an External Interconnection.