Factory Acceptance Test Procedures definition

Factory Acceptance Test Procedures or “FATP” means the tests required to be performed on the electronic security system, alarm monitoring and armed response in accordance with the overall test and evaluation plan prepared by the Contractor as a Contract requirement and in accordance with the systems Engineering Management Plan;
Factory Acceptance Test Procedures or “FATP” means the tests required to be performed on the Equipment in accordance with the overall test and evaluation plan prepared by the Contractor as a Contract requirement and in accordance with the systems Engineering Management Plan;

Examples of Factory Acceptance Test Procedures in a sentence

  • Preparation of Functional Design Specifications, Documents, Factory Acceptance Test Procedures, Site Acceptance Test & Final Acceptance Testing Procedures etc.

  • For the hardware provided, the Contractor shall submit Equipment Manufacturer’s Product Information, Installation Drawings, Shop Drawings (as applicable), Factory Acceptance Test Procedures, Factory Acceptance Test Results, Local Acceptance Test Procedures, Local Acceptance Test Results, Operations and Maintenance Manuals, according to the requirements of Section 16010.

  • Capacity and capability to perform the repair, refurbishment, and calibration of instruments The Offeror should discuss its ability to meet the delivery schedule, and its ability and commitment to maintain the total purchase of VADCPs planned for this procurement.The Offeror shall attach as exhibits its Factory Acceptance Test Procedures for VADCP instruments (electronic copy only, Contractor format, and no page limit).

  • Sign-off spaces for the individuals performing and witnessing the tests.‌ Factory Acceptance Test Procedures: Panels provided shall be interlocked or networked as applicable, operated, and checked-out by the equipment supplier prior to the FAT.

  • B1.2.9-Preparation of Functional Design Specifications, Documents, Factory Acceptance Test Procedures, Site Acceptance Test & Final Acceptance Testing Procedures, etc.

  • Factory Acceptance Test Procedures - Submit test procedures for approval, at least 90 days prior to the commencement of tests.

  • The Service Provider shall if requested by HKCMCL, not less than twenty‐one (21) days before any such Factory Acceptance Test Procedures are due to commence, submit for the approval of HKCMCL the relevant Factory Acceptance Test Procedure defining the tests to be conducted.

  • This agreement is for all early years Providers in the Private, Voluntary, Independent and Maintained Sectors based in York who wish to claim the Department for Education (DfE) funding for the delivery of Funded Early Education places (FE) for 2, 3 and 4 year olds.

  • DRSR Factory Acceptance Test Procedures 1) DRSR Sub-Rack Factory Acceptance Test Procedure 2) DRSR Wiring Kit Factory Acceptance Test Procedure Attachment J-002 5 3.8 Government Loaned Property The test equipment, i.e. hardware and diagnostic programs, required to perform factory acceptance testing, will be provided to the successful contractor as Government Loaned Property.

  • C-16 CDRL A025 Factory Acceptance Test (FAT) Plan 3.7.1.4.3.2 Factory Acceptance Test Procedures and Reports The Contractor shall prepare and submit Factory Acceptance Test (FAT) Procedures.

Related to Factory Acceptance Test Procedures

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.