Factory Acceptance Test Procedures definition

Factory Acceptance Test Procedures or “FATP” means the tests required to be performed on the VHF Equipment/infrastructure and equipment shelters in accordance with the overall test and evaluation plan prepared by the Contractor as a Contract requirement and in accordance with the systems Engineering Management Plan;
Factory Acceptance Test Procedures or “FATP” means the tests required to be performed on the electronic security system, alarm monitoring and armed response in accordance with the overall test and evaluation plan prepared by the Contractor as a Contract requirement and in accordance with the systems Engineering Management Plan;

Examples of Factory Acceptance Test Procedures in a sentence

  • To meet the activity and event entry per Clause 13, “Level Test Log,” an acceptable method for eliminating or combining test documents is to use the procedure and log as the same document (e.g., Factory Acceptance Test Procedures).

  • C-16 CDRL A025 Factory Acceptance Test (FAT) Plan 3.7.1.4.3.2 Factory Acceptance Test Procedures and Reports The Contractor shall prepare and submit Factory Acceptance Test (FAT) Procedures.

  • These tests are defined in the DSS Factory Acceptance Test Plan and Factory Acceptance Test Procedures documents as derived from the DSS Requirements Document.

  • The Commission furthermore invites Bundesnetzagentur to ensure that the provisions of Article 19(5) Gas Directive are also complied with by the employees of GASCADE which are not part of the management.In addition, as the remuneration of GASCADE's management, i.e. [BUSINESS SECRET], Bundesnetzagentur rightly states that this is not in compliance with the unbundling provisions of the EnWG transposing Article 19(5) Gas Directive.

  • Sign-off spaces for the individuals performing and witnessing the tests.‌ Factory Acceptance Test Procedures: Panels provided shall be interlocked or networked as applicable, operated, and checked-out by the equipment supplier prior to the FAT.

Related to Factory Acceptance Test Procedures

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Contract Specifications means the principal trading terms in CFD (for example Spread, Swaps, Lot Size, Initial Margin, Necessary Margin, Hedged Margin, the minimum level for placing Stop Loss, Take Profit and Limit Orders, financing charges, charges etc) for each type of CFD as determined by the Company from time to time. The Contract Specifications appear on the Website.

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Interconnection Request means a Generation Interconnection Request, a Transmission Interconnection Request and/or an IDR Transfer Agreement.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Busy Line Verification (BLV means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).