Examples of Full trailer in a sentence
Full trailer loads should arrive at the Venue in accordance with the official build-up dates and allocated time slots.
SPECIFY: Full trailer connections with air glad hands and electrical 7 wire trailer plug to end of frameYES: Provision shall be supplied to prevent diamond shapingof the frame.
Pallet / Crate / Box /Flightcase / Full trailer No Chilled Frozen Pallet / Crate / Box /Flightcase / Full trailer No Chilled Frozen Pallet / Crate / Box /Flightcase / Full trailer No Chilled Frozen Pallet / Crate / Box /Flightcase / Full trailer No Chilled Frozen Pallet / Crate / Box /Flightcase / Full trailer No Chilled FrozenRequired Services By signing this order form, you are placing an order for logistical services.
Open Top Container - nothing on site this is used for delivery by County Vehicles to pick up tires left on the ground at county site – charged by : Full trailer load (County Dump Truck 14 C.Y., or Brush Truck: 24 C.Y., or 40 C.Y.) $ PR/TON NAME OF BIDDER (Please print or type)SIGNED BY (Sign name in writing) (Title)ADDRESS TELEPHONE NO.
Full trailer loads are picked up by a licensed, insured contractor on a quarterly basis and transported to a pre-qualified location, where they are disassembled and all components are recycled.
Open Top Container - nothing on site this is used for delivery by County Vehicles to pick up tires left on the ground at county site – charged by : Full trailer load (County Dump Truck 14 C.Y.) $ NAME OF BIDDER (Please print or type)SIGNED BY (Sign name in writing) (Title)ADDRESS TELEPHONE NO.
Trailer Nord ABTrailer Nord can offer the following services adjacent to the terminal area at Eskilstuna Intermodal Terminal. Full trailer servicing such as welding curtain-siders, door repairs, replacing wheel bearings, etc.
Full trailer connections including air lines and seven wire cable and plug routed to rear of chassis - Hand control valve for trailer brakes - All rear brake chamber clevis pins shall be lubricated with an anti-seize lubricant - All rear brake shoe anchor pins shall be grease-able with grease fittings COMPLY Front steel disc, hub piloted (two hand hole) rims Rear steel disc, hub piloted (two hand hole) rims Front and Rear - Wheels shall be powder coated white.
PART-II DESIGN, FABRICATION, ERECTION, SUPPLY, TESTING & COMMISSIONING OF 12 T CAPACITY MOBILE FLAT BED PLATFORM (FULL TRAILER) 1.0 SCOPE OF WORK: Design, fabrication, testing, commissioning and supply of 12,000 kg (12 t capacity ) payload carrying capacity Flat Bed Mobile Platform (Toe bar type Full trailer).
Open Top Container - nothing on site this is used for delivery by County Vehicles to pick up tires left on the ground at county site – charged by : Full trailer load (County trailer 48-53 ft long semi trailer ) $ charged by : lbs.