Grid Connection Assessment definition

Grid Connection Assessment means a grid connection assessment issued by the Transmission System Operator in respect of the Offshore Wind Farm.
Grid Connection Assessment means a grid connection assessment issued by theTSO for the ORESS 1 Project in accordance with CRU/2022/14 Decision Paper on “Offshore Grid Connection Assessment – Phase 1 Projects”.
Grid Connection Assessment means a verification, if the proposed equipment for the generation and the installation design is certified for the use in Zambia and the equipment cannot export more energy into distribution or transmission system than up to 30 kVA at the specified grid connection point on the premises of the prosumer.

Examples of Grid Connection Assessment in a sentence

  • In that paper the CRU proposed the introduction of the concept of a Grid Connection Assessment (GCA) and related criteria for Phase 1 applicants.

  • The ORESS 1 Project is required to have received a Grid Connection Assessment in order to be eligible to participate in the ORESS 1 Auction.

  • SSE is of the view that CRU and EirGrid must provide further clarity before any decision is published, particularly in relation to issues around, for example, validity of the Grid Connection Assessment, treatment of Corporate Power Purchase Agreements, and qualification for a full grid connection offer.

  • Subject of CRU Consultation]To be eligible for ORESS 1, projects will also be required to provide evidence of having reached a certain point in the offshore grid connection process, referred to as a Grid Connection Assessment, the subject of public consultation by the CRU, https://www.cru.ie/document_group/offshore-grid-connection/.

  • There is also the difficulty that the Grid Connection Assessment will become the de facto mechanism for choosing which developers can bid, as every bid will have been made contingent upon a pre-existing agreement between the developer, the DSO, and the TSO.

  • Merchant Phase 1 projects should note their Grid Connection Assessment (GCA)1 remains valid until end of July 2024.

  • A Grid Connection Assessment means a grid connection assessment issued by the TSO for the ORESS 1 Project in accordance with CRU/2022/14 Decision Paper on “Offshore Grid Connection Assessment – Phase 1 Projects”.

  • The CRU notes that the decisions on the Full Connection Offer (FCO) validity, conditionality and execution (outlined in the decision table below) were already taken by the Commission in CRU202214 (Offshore Grid Connection Assessment – Phase 1 projects decision) and CRU2022968 (Offshore Connection Policy – Offshore Phase 1 Projects Grid Connection & Charging decision), however, the CRU is restating them here to apply to Merchant Phase 1 projects also.

  • The Terms and Conditions of ORESS 1 have been consulted upon by DECC22 and include reference to the Grid Connection Assessment.

  • The purpose of the GCA process is to provide supporting information to all Phase 1 projects for the ORESS 1 auction by detailing the connection method and cost of connecting the Phase 1 project to the transmission system at its onshore connection interface.In October 2022, the CRU published its Decision Paper (CRU/2022/968) on grid connection and charging policy associated with the Grid Connection Assessment (GCA).

Related to Grid Connection Assessment

  • Service Connection means all cables and equipment required to connect the supply mains to the electrical installation of the consumer at the point of supply;

  • conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Cross Connection means a jumper cable or similar connection provided pursuant to Collocation at the digital signal cross connect, Main Distribution Frame or other suitable frame or panel between (i) the Collocating Party’s equipment and (ii) the equipment or facilities of the housing party.

  • Interconnection is as defined in the Act.

  • Interconnection Service(s) means any Interconnection, Resale Services, 251(c)(3) UNEs, Collocation, functions, facilities, products or services offered under this Agreement.