Examples of Harvesting Tank in a sentence
If you have any questions, please contact Carol Turner at cturner@rid.org.
The horizontal PEX slinky coils are connected the rainwater harvesting storage tank as shown in Figure 4.2. Additionally, as a backup, the system has a cooling tower that runs an additional loop to keep the rainwater tank cool if needed.Figure 4.1. GH1 Ground Loop Installation Figure 4.2. Rainwater Harvesting Tank used in GH1The geothermal heat pump unit manufacturer is WaterFurnace®.
Financial) are invited from reputed contractors of appropriate class & category registered with CPWD, State PWD, MES, Railway, Engineering Services of HNBGU working contractors having experience of working in Central/ State Government, Public Sector undertaking/ Autonomous Organization of the Central/ State Government for “Construction of Rain Water Harvesting Tank, Compost Pit and Chain Link Fencing near Main Gate at SRT Campus Tehri”.
Construction of Rain Water Harvesting Tank at kannikalluAnganwadi65184 65984 73000169100 10464890 39’ 15.7”N, 90 39’ 11.2”N 90 41’24.6”N 90 40’46.1”N770 2’ 7.1” E 770 1’ 40.0 ” E 770 01’ 38.6” E770 2’ 36.9” E*Benefited area 30Ha*Benefited to 50 1.Rainwater Harvesting Tank Govt.LPS Pullumedu2.Well Recharge In Govt.
Subject: Cost estimate, design, size and capacity of Rain Water Harvesting Tank under Promotion of Horticulture in Shivalik Area (IHD) – 2017-18.Refer to the subject cited as above, the detailed cost estimate (with design, size and capacity) of Rain Water Harvesting Tank of Brick Masonry (amounting Rs. 74,000/-) and RCC (amounting Rs. 1,40,000/-) for hilly area are enclosed at Annexure-I & II under Promotion of Horticulture in Shivalik Area (IHD) – 2017-18.
Table.3.5.Entry point activities in the project area Name Of Watershed Panchayath Name Of WorkAmount (Rs.) Latitude LongitudeArea benefited(Ha)/beneficiariesAreaBeneficiaries Karinkulam Ayyappankoil1.Rainwater Harvesting Tank at Pachakkadu Sub- Centre 2.Rainwater Harvesting Tank at Govt.LPS Karinkulam 3.Providing Protection Wall for Panchayath Pond- Parappu 4.Renovation of public pond at Kannikkallu, Ayyappan kovil gramapanchayath5.
Since much of the plant area including Truck Parking area has been covered with RCC Roads and Bitumen roads, Drains have been maintained to collect the storm water & rain water and using the natural slope of Plant, waters will be collected to Rain water Harvesting Tank.
State:-H.P.Circle:-12th NahanBranch:-B&R.Division:-NahanZone:-ShimlaSub-Division:-Nahan Percentage Rate Tender/Item rate tender & contract for works Tender for the work:- C/o Veterinary Hospital Building at Kala-Amb, Tehsil Nahan, Sirmaur (HP) (SH:- C/o Building Portion, Providing Water Supply and Sanitary Installation, C/o Septic Tank with Soak Pit, Rain Water Harvesting Tank and Boundary Wall etc.).
Water Harvesting Tank (WHTs) 77 water harvesting tanks (WHTs) were excavated in almost all the project villages except Chakgovinddih of Duladih Panchayat.
Name of Work:- Construction of Rain Water Harvesting Tank, Compost Pit and Chain Link Fencing near Main Gate at SRT Campus TehriOnline open Percentage Rate Bids/ Tenders in Two Bid system (1.Technical 2.