Examples of Hazardous waste generator in a sentence
A Hazardous waste generator whose hazardous wastes are transported outside the generator’s premises shall comply with the packaging and labeling requirements as provided for in the Implementing Rules and Regulations of RA 6969 and prepare a spill response plan to be handed to the designated waste transporter.
Hazardous waste generator shall follow various steps (minimising the utility of hazardous elements, prevention, recovery, reuse by co processing, recycling, and safe disposal) of hazardous waste.
Hazardous waste generator facilities registered with the CUPA are not required to pay additional fees for the oversight of closure activities under most circumstances.
Hazardous waste generator must arrange for shipment of their hazardous waste to a facility permitted to accept it.
It is assumed that the Plant has an existing EPA Hazardous waste generator ID number, but if not, atemporary number from EPA for a one time generation and transport could be obtained which will minimize State and federal reporting requirements.
Hazardous waste generator reports will be submitted biannually to DTSC.
We will put your post experiment chemicals in the hazardous waste SAA.You need to take the Hazardous waste generator course before you can put anything into the waste area (SAA).
Hazardous waste generator areas: Building 899 Armory, Building 801 Contained Firing Facility, Building 875 Heavy Equipment, Building 883 WAA, Building 805 Process Area, Building 879 Fleet Management, and Building 874 Machine Shop.
Hazardous waste generator fees shall be determined based on the annualized cost to the Forester and Fire Warden to administer the hazardous waste generator program, where annualized cost is defined as the annual salaries, employee benefits, and overhead for the personnel assigned to administer and implement the hazardous waste generator program calculated from rates contained in the Forester and Fire Warden's rate package, as approved by the County Auditor-Controller.