Installation Date means the date specified in the Statement of Work by which the Contractor must have the ordered Equipment ready (certified) for use by the State.
Acceptance Date has the meaning set forth in Section 2.05(a)(v)(D)(2).
Final Acceptance Date means, in respect of any Offer, the final date for acceptance of such Offer which, if such Offer is extended prior to becoming unconditional, shall be the final date for acceptance of the extended Offer (but, if such Offer is or becomes unconditional, disregarding any additional or further period during which such Offer is open for acceptance);
meter installation means the meter and, if so equipped, the instrument transformers, wiring, test links, fuses, lamps, loss of potential alarms, meters, data recorders, telecommunication equipment and spin-off data facilities installed to measure power past a meter point, provide remote access to the metered data and monitor the condition of the installed equipment;
Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.
Acceptance Day shall have the meaning specified in paragraph 2B(5).
Occupancy Date means the date on which occupancy of all Units in a Project is permitted;
Installation Site means the site at which the Product is originally installed.
Building, structure, facility, or installation means all of the pollutant-emitting activities which belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person (or persons under common control) except the activities of any vessel. Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same major group (i.e., which have the same two-digit code) as described in the Standard Industrial Classification Manual, 1972, as amended by the 1977 Supplement (U.S. Government Printing Office stock numbers 4101-0066 and 003-005-00176-0, respectively).
Standard Installation means the installation of drop cable to a customer’s premise where the distance from the point of entry into the building being served is less than 150 feet from the active cable television system plant.
Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.
Final Completion Date means the date on which Final Completion occurs.
water installation means the pipes and water fittings which are situated on any premises and ownership thereof vests in the owner thereof and used or intended to be used in connection with the use of water on such premises, and includes a pipe and water fitting situated outside the boundary of the premises, which either connects to the connection pipe relating to such premises or is otherwise laid with the permission of the municipality;
Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).
Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.
Military installation means: a base, camp, post, station, yard, center, homeport facility for any ship, or other activity under the jurisdiction of the Department of Defense, including any leased facility, which is located within any of the several States, the District of Columbia, the Commonwealth of Puerto Rico, the U.S. Virgin Islands, Guam, American Samoa, the Northern Marianas Islands and any other U.S. Territory. Such term does not include any facility used primarily for civil works, rivers and harbors projects, or flood control projects.
Nuclear installation means any installation of such class or description as may be prescribed by regulations made by the relevant Secretary of State from time to time by statutory instrument, being an installation designed or adapted for:
Scheduled Completion Date shall be the date set forth in Clause 10.3;
Date of Acceptance means the date, which appears on the Notice of Acceptance and if no date appears is the date on which the Principal sent the Notice of Acceptance accepting the Contractor’s Tender.
New installation means an installation, construction of which began after the effective date of any regulation having application to it.
Monthly Date means the last Business Day of each calendar month.
Shipment Date , in relation to a mineral, means —
Put Option Repayment Date means the settlement date for the Put Option pursuant to Clause 10.3 (Mandatory repurchase due to a Put Option Event).
Letter of Acceptance (LOA) means the written notice issued by JMRC to the selected bidder(s) intimating the acceptance of selected bidder's Proposal for the award of License;
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
In-Service Date means the date on which the Facility and System Modifications (if applicable) are complete and ready for service, even if the Facility is not placed in service on or by that date.