Integrated project delivery definition

Integrated project delivery or "IPD" means a project delivery method in which there is a contractual agreement between an agency and a single participating entity for the design, construction, alteration, operation, repair, improvement, demolition, maintenance, or financing, or any combination of these services, for a public project.

Related to Integrated project delivery

  • Project Deliverables means the Project deliverables set out in Schedule 2. Project Material means all the material including but not limited to documents, computer software, and data stored by any means which is created by the Fellow in the course of undertaking the Project.

  • Interconnection Study means a study prepared by or on behalf of the Transmission Provider or the CAISO to evaluate the impact of the interconnection of the Generating Facility to the Transmission Provider’s electric system or the applicable Control Area operator’s electric grid.

  • Approved Project means the project as described in the bound volume entitled ‘Project Description’ initialled by or on behalf of the Minister and the Company for the purpose of identification;

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.