Interconnection Cost Allocation definition

Interconnection Cost Allocation. The total costs actually allocated to and borne by the Selected Project (either directly or through reimbursement to a transmission owner or other party) pursuant to the Selected Project’s Class Year Interconnection Facilities Study, interconnection agreement and/or other relevant agreement(s) (such as an engineering, procurement and construction contract) with NYISO or any relevant transmission owner, including any allocated costs of Connecting Transmission Owner’s Attachment Facilities, Distribution Upgrades, System Upgrade Facilities and/or System Deliverability Upgrades; provided that any costs (i) attributable to Developer’s Attachment Facilities7 or (ii) of operation, maintenance or other ongoing compliance requirements shall not be included in the Interconnection Cost Allocation. Terms capitalized but not defined in this definition shall have the meanings assigned to them by applicable NYISO tariffs.
Interconnection Cost Allocation. The total costs actually allocated to and borne by the Selected Project pursuant to NYISO interconnection requirements, as memorialized in the Selected Project’s interconnection agreement. Interconnection Cost Allocation Baseline: The estimated amount of Interconnection Cost Allocation established for the Selected Project in ORECRFP22-1. The Interconnection Cost Allocation Baseline under this Agreement is $ .

Examples of Interconnection Cost Allocation in a sentence

  • The amount, if positive, resulting from the following equation: (i) Interconnection Cost Allocation Baseline minus (ii) Interconnection Cost Allocation minus (iii) only if the Selected Project has switched its Injection Point from that contemplated in the Proposal, any additional costs incurred as a result of such change and any reasonably-incurred development costs (e.g., NYISO interconnection study fees) spent with respect to the Injection Point contemplated in the Proposal.

  • On or before the date that is 90 days prior to the commencement of the Contract Delivery Term, Seller shall make available or cause to be made available to NYSERDA all books and records reasonably necessary for NYSERDA to quantify the Interconnection Cost Allocation.

  • The Interconnection Cost Allocation Baseline under this Agreement is $__________.

  • The estimated amount of Interconnection Cost Allocation established for the Selected Project in ORECRFP23-1.

Related to Interconnection Cost Allocation

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Interconnection is As Defined in the Act.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.