Examples of Interim Deliverability Status in a sentence
Until such time that these DNUs are completed and placed in-service, the Generating Facility may be granted Interim Deliverability Status based on annual system availability.
The sections below provide a discussion of the timing of FCDS, Interim Deliverability Status, Area Constraints, and Operational Information.
The designated capacity must be the deliverable capacity of a resource with Full Capacity Deliverability Status, Partial Capacity Deliverability Status, or Interim Deliverability Status that is shown on the CAISO’s NQC list.
Throughout the Delivery Term, Seller shall use commercially reasonable efforts to maintain eligibility for Full Capacity Deliverability Status or Interim Deliverability Status for the Facility from the CAISO and shall perform all actions necessary to ensure that the Facility qualifies to provide Resource Adequacy Benefits to Seller.
IN-SERVICE DATE AND COMMERCIAL OPERATION DATE ASSESSMENTAn ISD and COD assessment was performed for the Generating Facility to establish SCE’s estimate of the earliest achievable ISD based on the cluster study process timelines and the time required for SCE to complete the facilities needed to enable physical interconnection as an Interim Deliverability Status or Energy-Only Deliverability Status interconnection (as applicable) for the Generating Facility.
For the delivery of Bundled Energy Product, Seller must bid an ERR Generating Facility based on an interconnection assuming either Energy Only Deliverability Status (“EO”), or such proposals that include the conferment by the CAISO of FCDS, Partial Capacity Deliverability Status (“PCDS”) or Interim Deliverability Status (“IDS”) (Collectively “Capacity Deliverability Status”),17 and a CAISO NQC assignment.
The Generating Facility contributes to the Lugo – Victorville 500kV line overload under various contingencies and will have Interim Deliverability Status until all the upgrades listed above are in service.
Until such time that these Delivery Network Upgrades are completed and placed into service, the Generating Facility may be granted Interim Deliverability Status based on annual system availability.
Throughout the Delivery Term, Seller shall maintain eligibility for Full Capacity Deliverability Status or Interim Deliverability Status for the Facility from the CAISO and shall perform all actions reasonably necessary to ensure that the Facility qualifies to provide Resource Adequacy Benefits to Seller.
The CAISO annually re-allocates unused capacity through its operational partial and interim Deliverability Assessment as part of the Phase II Interconnection Study.7 Through this process, interconnection customers that are unable to receive Full Capacity Deliverability Status or must wait for transmission facilities to be placed into service may receive Interim Deliverability Status where capacity is available on the CAISO system.