Job Control. Personal Data being processed on commission (i.e., Personal Data processed on a customer’s behalf) is processed solely in accordance with the Agreement and related instructions of the customer.
Job Control. SAP uses controls and processes to monitor compliance with contracts between SAP and its customers, subprocessors or other service providers. • As part of the SAP Security Policy, Personal Data requires at least the same protection level as “confidential” information according to the SAP Information Classification standard. • All SAP employees and contractual subprocessors or other service providers are contractually bound to respect the confidentiality of all sensitive information including trade secrets of SAP customers and partners.
Job Control. Personal Data being processed on commission (i.e., Personal Data processed on a customer’s behalf) is processed solely in accordance with the Agreement and related instructions of the customer. • SAP uses controls and processes to monitor compliance with contracts between SAP and its customers, subprocessors or other service providers. • As part of the SAP Security Policy, Personal Data requires at least the same protection level as “confidential” information according to the SAP Information Classification standard. • All SAP employees and contractual subprocessors or other service providers are contractually bound to respect the confidentiality of all sensitive information including trade secrets of SAP customers and partners.
Job Control. 1. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. The Engineer shall meet the minimum sampling frequencies set out in the TxDOT Guide Schedule applicable to the project for Sampling and Testing for materials. The testing must include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils, and Aggregates. The estimated number of samples and tests are based on quantities in the executed construction contract.
a. The Engineer shall ensure the testing is completed and input into Site Manager. NOTE: The contractor is responsible for testing Item 360 Concrete Paving.
b. The Engineer shall provide certified personnel, outlined in their Quality Assurance and Quality Control (QA/QC) plan, that are knowledgeable of all materials testing procedures. All personnel performing acceptance tests must provide certifications and must maintain the certifications throughout the project.
c. The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the Texas Asphalt Pavement Association (TXAPA) for Hot Mix Asphalt, ACI for concrete, and the Soils and Base Certification Program, as listed below.
d. The Engineer shall provide certified technicians to perform the following tests: Hot Mix Asphalt Testing, HMAC o Xxxxx 0X o Level 1B o Level 2 o All other tests in the Manual of Testing Procedures 200-F Series or ASTM Procedures not covered in Xxxxx 0X, Xxxxx 0X, or Level 2 will be administered by the state central lab per the QAP. Concrete Testing, ACI-American Concrete Association o Concrete Field Testing Technician - Grade I o Concrete Strength Testing Technician o Other tests outlined in the Manual of Testing Procedures 400-A Series or ASTM Procedures that are not covered by ACI Field and Strength Testing will be administered by the state central lab per the QAP. Soils and Base, HMAC o SB 101 Properties Specialist DocuSign Envelope ID: 5B10DF3F-01CC-4436-8E6B-37B38F170AB1 o SB 102 Field Specialist o SB 103 Materials Analyst Specialist o SB 000 Xxxxxxxx Specialist o SB 202 Compressive Strength Specialist o Other tests outlined in the Manual of Testing Procedures 100-E Series or ASTM Procedures that are not covered in SB101, SB102, SB103, SB201 and ...
Job Control. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. Meet the minimum sampling frequencies set out in the TxDOT 2015 Guide Schedule for Sampling and Testing for materials. The testing shall include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils and Aggregates. The estimated number of samples and tests are based on quantities in the executed construction contract.
Job Control. Measures that ensure that, in the case of commissioned processing of personal data, the data are processed strictly corresponding the instructions of the principal. • Training and confidentiality agreements for internal staff and external staff
Job Control. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. Meet the minimum sampling frequencies set out in the TxDOT 2015 Guide Schedule for Sampling and Testing for materials. The testing shall include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils and Aggregates. The DocuSign Envelope ID: 8B47F4E0-92EC-4E2B-A7F3-2A6F4173893E estimated number of samples and tests are based on quantities in the executed construction contract.
Job Control. 1. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. Meet the minimum sampling frequencies set out in the TxDOT 2015 Guide Schedule for Sampling and Testing for materials. The testing shall include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils and Aggregates. The estimated number of samples and tests are based on quantities in the executed construction contract.
i. The Engineer shall ensure the testing is completed and input or import results directly into Site Manager. NOTE: The contractor is responsible for testing Item 360 Concrete Paving.
ii. The Engineer shall provide certified personnel, outlined in their Quality Assurance and Quality Control (QA/QC) plan that are knowledgeable of all materials testing procedures. All personnel performing acceptance tests must provide certifications and must maintain the certifications throughout the project. The State reserves the right to require replacement of any technician during this contract if performance is determined to be unsatisfactory or the technician fails to maintain appropriate certifications.
iii. The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the Texas Asphalt Pavement Association (TxAPA) for Hot Mix Asphalt, and the Soils and Base Certification Program, as listed below.
iv. The Engineer shall provide certified technicians to perform the following tests:
Job Control. Personal Data being processed on commission (i.e., Personal Data processed on a 작업 제어. 위탁 처리되는 개인 정보(예: 고객을 대신하여 처리된 개인 정보)는 본 계약 및 고객의 관련 지침에 따라서만 처리됩니다.