Lead abatement project definition

Lead abatement project means one or more lead abatement activities that are conducted by a lead abatement contractor and are reasonably related to each other.
Lead abatement project means any work performed in order to abate the presence of lead based paint. This term includes but is not limited to the measures listed in 1.2.1.
Lead abatement project means an activity in target housing or child-occupied buildings intended to permanently remove or encapsulate lead-based paint, lead-containing dust, lead- containing soil or other lead-containing materials and decontamination of an area, but does not include interim controls which do not permanently eliminate lead hazards.

Examples of Lead abatement project in a sentence

  • Lead abatement project Project permitrevision fee $25.00.(d) Fees imposed by this section and monies collected under section 1766 of this chapter shall be deposited into the Lead Lead-Based Paint Abatement Accreditation and Licensing Special Fund.

  • Lead abatement project designers shall comply with rules 3701-32-03, 3701-32-04, 3701-32-10, 3701-32-15 and 3701-32-19 of the Administrative Code.

  • Amendment Original Filing Yes Yes 3701-32-09 Lead abatement worker scope of practice and standards of conduct.Amendment Original Filing Yes Yes 3701-32-10 Lead abatement project designer scope of practice and standards of conduct.

  • NBS programs aim to maximize the identification of SMA patients before the first symptoms emerge, and the early detection and diagnosis might mean the difference between life and death for an infant born with SMA.

  • Authorization to withdraw the following out of maintenance reserve:  $10,200.00 for sound system at Boyd Street Field  $23,680.00 for the Lead abatement project at Elementary #1  $7,450.00 for new axle in the Grounds Tractor  $16,300.00 for boiler repairs to Administration Building and Elem.

  • In what follows, linguistic tests are presented which are supposed to tell the two kinds from each other, which have been provided by Carlson et al.

  • Lead abatement project" means one or more lead abatement activities that are conducted by a lead abatement contractor and are reasonably related to each other.

  • Lead abatement project: The replacement, encapsulation, enclosure, or removal of a lead-bearing substance on a particular component within a particular location, which will remove or reme- diate the lead hazard(s) for at least twenty (20) years.

Related to Lead abatement project

  • Lead abatement means any measure or set of measures designed to permanently eliminate lead-based paint hazards, including lead-contaminated dust or soil.

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Redevelopment project means any work or undertaking

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Landlord Work means the work, if any, that Landlord is obligated to perform in the Premises pursuant to a separate agreement (the “Work Letter”), if any, attached to this Lease as Exhibit C.

  • Development Project means a project for the development of land within a

  • Tenant Improvements Defined in Exhibit B, if any.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Investment Project means an investment in qualified buildings

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Tenant Delays means delays caused by: (i) requirements of the Plans and Specifications requested by Tenant that do not conform to Landlord’s building standards for office and lab build-out, or which contain long lead-time or non-standard items requested by Tenant; provided that Landlord has notified Tenant of such deviations upon execution of this Lease (ii) any material change in the Plans and Specifications requested by Tenant and agreed to by Landlord; (iii) any request by Tenant for a delay in the commencement or completion of the Initial Tenant Improvements for any reason; (iv) Tenant delay in finalizing and approving the design of the vivarium and value engineering of same or (v) any other act or omission of Tenant or its employees, agents or contractors which reasonably inhibits the Landlord from timely completing the Initial Tenant Improvements including, without limitation any delays caused by Tenant’s presence in the Premises prior to the Term Commencement Date. The Premises shall not be deemed to be incomplete if only minor or insubstantial details of construction, decoration or mechanical adjustments remain to be done which do not unreasonably interfere with Tenant’s occupancy of the Premises. If as a result of Tenant Delays the Premises are deemed ready for Tenant’s occupancy, pursuant to the foregoing (and the term shall have commenced by reason thereof), but the Premises are not in fact actually ready for Tenant’s occupancy, Tenant shall not (except with Landlord’s consent not to be unreasonably withheld, conditioned or delayed) be entitled to take possession of the Premises for the permitted use until the Premises are in fact actually ready for such occupancy.

  • Eligible Project Costs means such portion of the Project costs disbursed and loaned from the OPWC to the Recipient for the sole and express purpose of acquiring, constructing, reconstructing, expanding, improving, engineering and equipping the Project, other direct expenses, and related financing costs thereto.

  • Redevelopment Property means a property owned by the Company or a Consolidated Subsidiary (a) where the commenced leased square footage is less than 60% of the sum of net rentable square feet and redevelopment space, with reasonable adjustments to leased square footage determined in good faith by the Company, including adjustments for available power, required support space and common area and (b) that the Company reasonably characterizes as held in whole or in part for redevelopment.

  • Public improvement costs means the costs of:

  • Landlord Delay shall occur if either: (i) Landlord fails to complete the Base Building and/or other improvements on the Project that are required by the DDA, the Parking REA and/or the CC&Rs, and as a direct result of such failure Tenant is unable to obtain a temporary or permanent certificate of occupancy for the Premises upon substantial completion of the Tenant Improvements; or (ii) substantial completion of the Warm Shell Improvements or Tenant Improvements is delayed directly and solely as a result of any of the following and such delay could not have been mitigated by Tenant using commercially reasonable measures, which delay occurs after the Delivery Date and before the Commencement Date and does not result from Tenant's interference or delay in connection with completion of the Tenant Improvements or after a Tenant Default or Work Letter Draw Event: (a) subject to Paragraph 8 above, unreasonable interference by Landlord or Landlord's Contractor with the construction of the Warm Shell Improvements or the Tenant Improvements; (b) Landlord's failure to comply with any deadlines for response to, or submissions from, Tenant as required by this Work Letter; (c) any material Discretionary Changes to Landlord's Plans or the Warm Shell Plans after their final approval by applicable governmental entities (other than Tenant Modifications) that directly affect Tenant's Plans or the Tenant Improvements; and/or (d) Landlord failure to complete portions of the Base Building and/or other improvements on the Project that are Landlord's obligation to complete hereunder, and as a direct result of such failure Tenant and Tenant's contractors do not have access to the Premises to the extent required to complete the Warm Shell Improvements and/or Tenant Improvements. Tenant shall give Landlord at least five (5) days prior notice if Tenant becomes aware that Landlord is in danger of causing a Landlord Delay, and if Landlord takes appropriate measures to prevent such delay within such five (5) day period, no adjustment to the Commencement Date shall be made on account of such Landlord; provided, however, that if such delay was not reasonably foreseeable by Tenant, the five (5) day period for prior notice and opportunity to mitigate provided above shall be changed to forty-eight (48) hours after Tenant becomes aware of such delay or potential delay.

  • Total Project Costs means the total amount of money required to complete the Project.

  • Tenant’s Work means all improvements, alterations, fixture, equipment, and signage installation, and furniture placement necessary or appropriate for the conduct of the Permitted Use, including all work described as Tenant’s Work on Exhibit D, attached (the “Work Letter”).

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Qualified Project Costs shall have the meaning given to it in the Regulatory Agreement.