Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.
Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Risk assessment means a programme to determine any risk associated with any hazard at a construction site , in order to identify the steps needed to be taken to remove, reduce or control such hazard;
Medical assessment means an assessment of a patient’s medical condition secured by our Assistance Company working in conjunction with the Medical Evacuation Provider’s medical director and in collaboration with the attending physician. The Assistance Company in collaboration with the Medical Evacuation Provider, will utilize the assessment to determine at its sole discretion whether a Plan Holder is fit to fly; the most appropriate means to provide medical evacuation; the medical personnel who will be accompanying the patient on the transport; and to confirm the medical facility closest to one’s home can meet their medical needs. If the patient’s medical facility of choice is unable to provide the high level of medical care required by the patient, arrangements will be made to transport the patient to the appropriate medical facility closest to their home, or closest to patient's preferred medical facility in the US when possible.
Internal test assessment means, but is not limited to, conducting those tests of quality assurance necessary to ensure the integrity of the test.
Needs assessment means a study or statistical analysis that examines the need for ground ambulance service within a service area or proposed service area that takes into account the current or proposed service area’s medical, fire, and police services.
Impact Assessment has the meaning given to it in Clause 22.1.3 (Variation Procedure);
Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.
conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;
Site Assessment means a Site Assessment as defined in Paragraph 10(c).
Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.
Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.
Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.
Risk and needs assessment means an actuarial tool scientifically proven to identify specific factors and needs that are related to delinquent and noncriminal misconduct;
Data Protection Impact Assessment means an assessment by the Controller of the impact of the envisaged processing on the protection of Personal Data.
Family assessment means a comprehensive assessment of child
Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.
Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).
Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);
Cluster development means a contiguous cluster or
Natural Resources Assistance Council means the natural resources assistance council created pursuant to Ohio Revised Code Section 164.21 as well as its members and officers.
Comprehensive assessment means the gathering of relevant social, psychological, medical and level of care information by the case manager and is used as a basis for the development of the consumer service plan.
Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;
Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;