Local Distribution Grid means, within a defined geographical zone, a series of gas pipelines and associated ancillary equipment, which are needed for the distribution of Natural Gas on a regional or local level.
Local Distribution Grid is through "Transfer Constructions" including an immediate post of "Power Plant", Connecting lines of this post with the first post of ["Country's Electricity Grid"] ["Local Distribution Grid"] and also relevant feeders of ["Country's Electricity Grid"] ["Local Distribution Grid"]
Local Distribution Grid or “Distribution Grid” or “Distribution Network” shall mean, within a defined geographical zone, a series of gas pipelines and associated ancillary equipment, which are needed for the distribution of Natural Gas on a regional or local level. “m³(n)/h” shall mean m³(n) per hour as defined in section 1.2 of the Belgian Gas Act.
Examples of Local Distribution Grid in a sentence
Prisoners on administrative status may be served meals with trays and utensils consistent with reasonable precautions designed to protect safety, security, or orderly management of the facility.
More Definitions of Local Distribution Grid
Local Distribution Grid or “Distribution Grid” or “Distribution Network” shall mean, within a defined geographical zone, a series of gas pipelines and associated ancillary equipment, which are needed for the distribution of Natural Gas on a regional or local level. mt(n)” or “cubic meter in base conditions” shall mean the volume of (1) cubic meter of Natural Gas, free of water vapor, at zero(0) degrees Celsius and at an absolute pressure of one decimal zero one three two five (1.01325) bar waterdamp (normal conditions). “mt(n)/h” shall mean m³(n) per hour as defined in section 1.2 of the Belgian Gas Act.
Local Distribution Grid connect to "Power Plant". "Buyer" is responsible for the installation costs of this system. 3-2- Energy measuring systems should be installed in a suitable place and kept against all external factors and effects. Then it is necessary to be sealed after calibration of system and approval of both parties. Only authorized stuff of "Buyer" is entitled to break these seals and put a new seal. It should be in presence of representatives of "Seller" in order to have inspection, maintenance, test, regulation and calibration of measuring systems. Plumbing method should bear the agreement of both "Parties".
Local Distribution Grid. In this case, the connection of "Power Plant" to ["Country's Electricity Grid"] ["
Local Distribution Grid or “Distribution Grid” or “Distribution Network” s hall mean, within a defined geographical zone, a series of gas pipelines and associated ancillary equipment, which are needed for the distribution of Natural Gas on a regional or local level. m³(n)” or “cubic meter in base conditions” shall mean the volume of (1) cubic m eter of Natural Gas, free of water vapor, at zero(0) degrees Celsius and at an a bsolute pressure of one decimal zero one three two five (1.01325) bar waterdamp (normal conditions).
Local Distribution Grid. Seller" is obliged for "Operation" of "Power Plant" and Post of KW (Immediate) and transfer of ownership and utilization of KW line and relevant feeders of post ["Country's Electricity Grid"] ["Local Distribution Grid"] to [………….. Regional Electricity Co. ] [… Distribution Company of Electricity Power] in compliance with content of part 14-7 of general conditions gratuitously. ("Measuring and Delivery Point" will be in compliance with first mode of diameter connection of "Power Plant" to "Grid" as mentioned in enclosure 5)}/ {Also he is obliged for ………… KW line and may transfer the ownership and utilization of relevant feeders in post of ["Country's Electricity Grid"] ["Local Distribution Grid"] to [… Regional Electricity Co.] [… Distribution Company of Electricity power] with regard to the content of part 14-7 of general conditions. ("Measuring and Delivery Point" will be in compliance with second mode of diameter connection of "Power Plant" to "Grid" as mentioned in enclosure 5)}