Examples of Main Metering System in a sentence
The Delivery Point shall be where the Main Metering System is located.
They include asymmetric information problems between the lender and originator (predatory lendingand borrowing), between the lender and investors, between the servicer and investors, between the servicer and borrower, between the beneficiary of invested funds and asset managers, and between the beneficiary of invested funds and credit rating agencies.
The Seller shall, in accordance with Prudent Operating Practice, supply and install, test and commission the Main Metering System employed for purposes of measurement and billing under this Agreement.
In the event of the Main Metering System is not in service for the reason of maintenance, repairs or testing, then the Backup Metering System/Check Meter shall be used during the period for which the Main Metering System is not in service and the provisions above shall apply to the reading of the Backup Metering System.
The Main Metering System and the Backup Metering System shall be sealed in the presence of representatives of Solar Power Generator and MSEDCL.
The Main Metering System and the Backup Metering System shall be sealed in the presence of representatives of Hybrid Power Developer, MSETCL and MSEDCL.
In the event that the Main Metering System is not in service as a result of maintenance, repairs or testing, then the Backup Metering System/Check Meter shall be used during the period the Main Metering System is not in service and the provisions above shall apply to the reading of the Backup Metering System.
RE Supplier shall design, finance, construct and install the Main Metering System at each facility and shall design, finance, construct and install a Metering System at each facility.
When the Main Metering System and / or Backup Metering System/Check Metering System and / or any component thereof is found to be outside the acceptable limits of accuracy or otherwise not functioning properly, it shall be repaired, re-calibrated or replaced by the Hybrid Power Developer and / or MSETCL/MSEDCL at Hybrid Power Developer’s cost, as soon as possible.
Any meter seal(s) shall be broken only by MSETCL/MSEDCL’s representative in the presence of Hybrid Power Developer’s representative whenever the Main Metering System or the Backup Metering System is to be inspected, tested, adjusted, repaired or replaced.