Manual operation definition

Manual operation means that a full-time boiler operator or stationary steam engineer is required to observe boiler pressures, temperatures, and levels and to make adjustments as the output demand fluctuates. A partially automated boiler must be classified as being manually operated.
Manual operation. The door assembly shall be fabricated to permit the manual lifting of the door for emergency use after automatic closing, with door returning to the closed position when released. The open and stop buttons shall be of the type requiring only momentary pressure to be operated. The close button shall be of the type requiring constant pressure to maintain the closing motion of the door. Push buttons shall be fully guarded to prevent accidental operation. Hood Enclosure: 24 gauge (0.70 mm) thick galvanized steel; internally reinforced to maintain rigidity and shape. Provide all hoods with a flame baffle controlled by a fusible link and designed to close against the coil in the event of fire, to reduce flame and smoke spread. INSTALLATION Attachment to Wall: The door assembly shall be attached to the wall by through-wall bolts. Expansion anchors may be used for concrete, brick or filled concrete masonry wall units, when installed in accordance with the requirements of NFPA 80. Where structural steel frames are used at jambs, guides shall be secured to the frame with machine bolts of not less than .375 inch (9.5 mm) diameter. Brackets: Brackets mounted on the face of the wall shall be bolted either to the wall or to an extension of the guide wall angle with not less than two-through bolts or machine bolts 12.7 mm diameter, to each bracket. Brackets mounted between jambs shall be secured to the lintel or to the side of the jambs by not less than two machine bolts of .50 inch (12.7 mm) diameter.

Examples of Manual operation in a sentence

  • Manual operation of DG sets and monitoring of fuel level / fluid leak / coolant level / battery charger working etc.3.17.

  • Manual operation of the screed is permitted in the construction of irregularly shaped and minor areas.

  • Trade unions had formed in 1933, and oil field workers went on strike in 1938.

  • Manual operation means operation by hand without using any other source of Power.

  • Manual operation is used for commissioning, maintenance, and repair.

  • At the end of the Automatic Cook Period the Auto Symbol will flash and an intermittent bleeping sound will be heard.The audible tone will continue unless cancelled.The ‘Auto’ symbol will continue to flash until the timer is returned to Manual operation (see below).

  • Manual operation of windows or shades might work in home and some small buildings.

  • Manual operation switch shall be provided in the control room with a cover to avoid accidental operation of it.

  • The employer shall assure that all super- vised employee alarm systems are test- ed at least annually for reliability and adequacy.(5) The employer shall assure that the servicing, maintenance and testing of employee alarms are done by persons trained in the designed operation and functions necessary for reliable and safe operation of the system.(e) Manual operation.

  • Manual operation will be permitted for the remainder of the day when automatic controls fail, provided specified results are obtained.

Related to Manual operation

  • Normal operation means all periods of operation except start-up and shutdown operations and maintenance of equipment;

  • Annual Operating Plan has the meaning ascribed to it in Section 15.3(b)(i).

  • Commercial Operation means the condition of operation in which the complete equipment covered under the Contract is officially declared by the Owner to be available for continuous operation at different loads up to and including rated capacity. Such declaration by the Owner, however, shall not relieve or prejudice the Contractor of any of his obligations under the Contract.

  • Initial Operation means the first integral operation of the complete equipment covered under the Contract with the sub-system and supporting equipment in service or available for service.

  • Commercial Operations Upon satisfaction of the following conditions, the Facility shall be considered to have achieved Commercial Operations on the Day specified in Seller's written notice described below: (i) the Acceptance Test has been passed, (ii) all generating units have passed Control System Acceptance Tests, (iii) the Transfer Date has occurred, (iv) Seller has (1) provided to Company the Required Models (as defined in Section 6(a) (Seller's Obligation to Provide Models) of Attachment B (Facility Owned by Seller)) in the form of Source Code, (2) placed the current version of the Source Code for the Required Models with the Source Code Escrow Agent as required in Section 6(b)(i)(A) (Establishment of Source Code Escrow) of Attachment B (Facility Owned by Seller), or (3) if Seller is unable to arrange for the placement of the appropriate Source Code into the Source Code Escrow account, placed the required funds with the Monetary Escrow Agent as required in Section 6(b)(ii)(A) (Establishment of Monetary Escrow) of Attachment B (Facility Owned by Seller), and (v) Seller provides Company with written notice that (aa) Seller is ready to declare the Commercial Operations Date and (bb) the Commercial Operations Date will occur within 24 hours (i.e., the next Day).

  • Commence commercial operation means, with regard to a unit that serves a generator, to have begun to produce steam, gas, or other heated medium used to generate electricity for sale or use, including test generation subject to the following:

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;

  • Annual Operating Budget as defined in Section 6.2(c).

  • In operation means engaged in activity related to the primary design function of the source.

  • Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.

  • Commercial Operation Date means the date on which a Material Project is substantially complete and commercially operable.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Date of Commercial Operation means the date on which the (nuclear or non-nuclear) power plant has successfully passed all performance and operational tests required by the end customer for commercial operation. In all other cases the warranty shall apply for twenty-four (24) months from delivery of the goods or performance of the services, or such longer period of time as customarily provided by Supplier, plus delays such as those due to non-conforming goods and services. The warranties shall apply to Buyer, its successors, assigns and the users of goods and services covered by this Order.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • construction site means a workplace where construction work is being performed;

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.

  • Radiation safety officer means an individual who has the knowledge and responsibility to apply appropriate radiation protection regulations and has been assigned such responsibility by the licensee or registrant.

  • Construction Services means either of the following for construction-manager-at-risk, design-build and job-order-contracting project delivery methods:

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.