Manufacturing Request definition

Manufacturing Request means the Customer's written request for Products issued in accordance with Clause 4.2;
Manufacturing Request has the meaning set forth in Section II.C.

Examples of Manufacturing Request in a sentence

  • Area Comm./Civic: None Existing Zoning: M, Manufacturing Request: Miscellaneous Graphic Permit 3375.12, Graphics requiring graphics commission approval.

  • Port A’s current fee schedule is summarized below:Application Fees • Expansion Application - $2,500 • Boundary Modification - $1,500 • Manufacturing Request - $3,000 • Subzone Application - $15,000Activation Fees • Single, one-time fee for all zone types - $5,000.

  • Key Manufacturing Request (See Chapter 12): This form will be used to request additional keys be made for locks or change locks.

  • However, EBS will interpret the rejection status as the need to initiate a different method support and will take appropriate action to fill the open requirement against the requisition alert via a new procurement or Local Manufacturing Request if appropriate.

  • In a case where the complaint is between a Teaching Faculty member and an administrative or staff person, the appointment process and membership of the Harassment and Abuse Hearing Committee are described in section II.A. 2.a. immediately below, except that, if the circumstances described in sections II.A.2.b., II.A.2.c., and/or II.A.2.d. apply, the appointment process and/or membership of the Harassment and Abuse Committee shall be modified as stated in sections II.A.2.b., II.A.2.c., and/or II.A.2.d.

  • Separate manufacturing requests to the Board consist of: • Fast-Track Manufacturing Request for Existing FTZs - Section 400.32(b)(1) of the FTZ Board regulations (15 CFR Part 400) provides for the submission and processing of certain applications for non-controversial manufacturing authority within existing zones or subzones using a reduced process with no application fee.

  • Roll call: Yes – Reising, Kenney, Janes, Sparrow, Nordman, Griffin, Finfrock.

Related to Manufacturing Request

  • Diagnostic clinical procedures manual means a collection of written procedures that describes each method (and other instructions and precautions) by which the licensee performs diagnostic clinical procedures; where each diagnostic clinical procedure has been approved by the authorized user and includes the radiopharmaceutical, dosage, and route of administration.

  • Manufacturing Services means the manufacturing, quality control, quality assurance, stability testing, packaging, and related services, set forth in this Agreement, required to manufacture Product or Products from Active Materials and Components;

  • Manufacturing Materials means parts, tools, dies, jigs, fixtures, plans, drawings, and information produced or acquired, or rights acquired, specifically to fulfill obligations set forth herein.

  • Manufacturing Process means any process for—

  • Product Specification means a product specification for a Medical Device set out in Schedule 2;

  • Manufacturing Know-How means, with respect to the Product or any Variant thereof, the technology, data, designs, processes, methods, specifications and other know-how used in connection with the formulation, manufacture, labeling, packaging, quality control, release testing, and production of the Product, and all ingredients used therein and portions thereof.

  • Product Specifications means the specifications, features and/or terms of any "Contract" (as defined in the LME Rules) listed for trading on the LME, as described in the LME Rules;

  • Manufacturing Site means a location where a manufacturing

  • API means American Petroleum Institute.

  • Commercialization Plan has the meaning set forth in Section 6.2.

  • Manufacturing Facility means buildings and structures, including machinery and equipment, the primary purpose of which is or will be the manufacture of tangible goods or materials or the processing of such goods or materials by physical or chemical change.

  • Clinical Supply Agreement shall have the meaning set forth in Section 7.2.

  • Manufacturing Agreement has the meaning set forth in Section 2.6.

  • Drug Substance means an active ingredient that is intended to furnish pharmacological activity or other direct effect in the diagnosis, cure, mitigation, treatment, or prevention of disease or to affect the structure or any function of the human body, but does not include intermediates used in the synthesis of such ingredient.

  • Manufacturing operation means a process in which materials are changed, converted, or transformed into a different state or form from which they previously existed and includes refining materials, assembling parts, and preparing raw materials and parts by mixing, measuring, blending, or otherwise committing such materials or parts to the manufacturing process. "Manufacturing operation" does not include packaging.

  • Development Plan has the meaning set forth in Section 3.2.

  • Manufacturing Technology means any and all patents, patent applications, Know-How, and all intellectual property rights associated therewith, and including all tangible embodiments thereof, that are necessary or useful for the manufacture of adeno- associated viruses, adeno-associated virus vectors, research or commercial reagents related thereto, Licensed Products, or other products, including manufacturing processes, technical information relating to the methods of manufacture, protocols, standard operating procedures, batch records, assays, formulations, quality control data, specifications, scale up, any and all improvements, modifications, and changes thereto, and any and all activities associated with such manufacture. Any and all chemistry, manufacturing, and controls (CMC), drug master files (DMFs), or similar materials provided to regulatory authorities and the information contained therein are deemed Manufacturing Technology.

  • Reference biological product means the single biological product licensed pursuant to 42 U.S.C.

  • Active Pharmaceutical Ingredient or “API” shall mean one or more of the following active pharmaceutical ingredients: tenofovir alafenamide (“TAF”), tenofovir disoproxil fumarate (“TDF”), elvitegravir (“EVG”), and cobicistat (“COBI”).

  • Pharmaceutical Product shall have the meaning ascribed to such term in Section 3.1(hh).

  • Additional Product means any Product identified as such in the Product Terms and chosen by Enrolled Affiliate under this Enrollment.

  • Finished Product means a cannabis product in its final form to be sold at a retail premises.

  • Milk product or "dairy product" means cottage cheese, dry curd cottage cheese, reduced fat cottage cheese, lowfat cottage cheese, cream, light cream, light whipping cream, heavy cream, heavy whipping cream, whipped cream, whipped light cream, sour cream, acidified sour cream, cultured sour cream, half-and-half, sour half-and-half, acidified sour half-and-half, cultured sour half-and-half, reconstituted or recombined milk and milk products, concentrated milk, concentrated milk products, skim milk, lowfat milk, frozen milk concentrate, flavored milk, eggnog, buttermilk, cultured milk, cultured lowfat milk, cultured skim milk, yogurt, lowfat yogurt, nonfat yogurt, acidified milk, acidified lowfat milk, acidified skim milk, low-sodium milk, low-sodium lowfat milk, low-sodium skim milk, lactose-reduced milk, lactose-reduced lowfat milk, lactose-reduced skim milk, aseptically processed and packaged milk, milk products with added safe and suitable microbial organisms, and any other milk product made by the addition or subtraction of milkfat or addition of safe and suitable optional ingredients for protein, vitamin, or mineral fortification. Unless a product is considered a milk product under this subdivision, milk product does not include dietary products, infant formula, ice cream or other desserts, cheese, or butter. Milk products include the following:

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Contract Specifications means the principal trading terms in CFD (for example Spread, Swaps, Lot Size, Initial Margin, Necessary Margin, Hedged Margin, the minimum level for placing Stop Loss, Take Profit and Limit Orders, financing charges, charges etc) for each type of CFD as determined by the Company from time to time.

  • Active Ingredient means any com- ponent that is intended to furnish pharmacological activity or other di- rect effect in the diagnosis, cure, miti- gation, treatment, or prevention of dis- ease, or to affect the structure or any function of the body of humans. The term includes those components that may undergo chemical change in the manufacture of the drug product and be present in the drug product in a modified form intended to furnish the specified activity or effect.