Examples of Materials utilization in a sentence
Incorporating the following items into an internal policy document will enhance the effectiveness of the Program: • Mission statement;• Program objectives;• Strategy;• Execution phases (including routine operations);• Description of a snow/weather event;• Communications (internal and external);• Personnel requirement;• Weather monitoring requirement;• Materials utilization plan;• Technical and equipment requirements; and• Performance measurement and reporting.
Materials utilization management is a process for planning, executing and controlling the field and office activities in a construction project and its impacts on surrounding environment.
N/S1 Flow Path rights are assigned to Shippers with primary NPT receipt points and primary SPT delivery points.
Data answering this research question are contained in Table 4 Table 4: Mean and Standard Deviation of Extent of Instructional Materials utilization for teaching Economics.S/N Instructional Materials SD Decision 1 Charts 3.01 0.75 Highly Utilized 2 Maps 1.84 0.94 Moderately Utilized 3 Graphs 2.97 0.85 Highly Utilized 4.
Disadvantages• Suitable for simple shapes and low production volume only.• Difficult to maintain close tolerances.• Materials utilization is poor CLOSED DIE FORGING• In closed die forging, cavities or impressions are cut in the die block, in which the metal is forced to take its final shape and dimensions.madinpoly.com• This method is used to produce forged shapes in large quantities.
The term yield means Materials utilization and the whole casting yield means during casting process performed complete use of materials & unnecessary wastage of materials is minimize.casting yield depends on factors such as type of casting (i.e. size, shape complexity, weight, and section thickness), alloys used, molding media and methods, and foundry practice (i.e. Risering methods).