Maximum Construction Period definition

Maximum Construction Period means the later of
Maximum Construction Period for a Development Project, including an Expansion Project, means the construction period indicate in the original projected construction schedule set forth in such Development Project's Construction Contract plus three (3) months.
Maximum Construction Period means construction has been on-going for not longer than the applicable period for the Facility model type as set forth in Section 7.2.2 hereof.

Examples of Maximum Construction Period in a sentence

  • At the end of the licence period, CDA may review the performance of the Developer and if found satisfactory, CDA may extend the agreement period upon mutually agreed terms and conditions.▪ Maximum Construction Period is 1 year 6 months from date of hand over of possession and deferred license fee period of 6 months post completion of Construction Period.

  • The Construction Period shall be from the approval of Xxxxxx’s Production Plan by the Lessor until the Production Commencement Date, which shall not exceed the Maximum Construction Period.

  • Maximum Construction Period of Indemnity (Gross Profits): XXX monthsItem 9.

  • At the end of the licence period, CDA may review the performance of the Developer and if found satisfactory, CDAmay extend the agreement period upon mutually agreed terms and conditions.▪ Maximum Construction Period is 1 year from date of handed over of possession and deferred license fee period of 6 month post completion of Construction Period.

  • At the end of the licence period, CDA may review the performance of the Developer and if found satisfactory, CDA may extend the agreement period upon mutually agreed terms and conditions.▪ Maximum Construction Period is 1 year from approval of plan or date of issue of occupancy certificate, whichever is earlier, and deferred license fee period of 6 month post completion of Construction Period.

  • This option covers contracts that commence during the Period of Insurance as well as contracts that are still within their construction or maintenance periods immediately prior to the commencement of the Period of Insurance.Cover ends at Practical Completion, the expiry of the Maximum Construction Period (plus Maintenance Period if applicable), or the end of the Period of Insurance, whichever occurs first.

  • Mr. Green suggested that weekday evening meetings may require bifurcation into hour and a half sessions.

  • At the end of the license period, CDA may review the performance of the Developer and if found satisfactory, CDA may renew the agreement period as per performance of the allottee.▪ Maximum Construction Period is one year from date of handed over of possession and deferred license fee period is 6-month of post completion of Construction Period.


More Definitions of Maximum Construction Period

Maximum Construction Period means, with respect to an Undeveloped Site, the period commencing on the Document Closing Date and ending on the earliest of (i) October 7, 1998, (ii) the Completion Date of the Facility on such Undeveloped Site, and (iii) an early termination of the Construction Period as to such Undeveloped Site pursuant to Section 5.1 of the Construction Agency Agreement.
Maximum Construction Period means the maximum period from the beginning of Phase II that Lessee has to finish construction and/or installation of the Improvements, as more particularly described in Section 3.2 of this Lease.

Related to Maximum Construction Period

  • Scheduled Construction Period means the period commencing from the Appointed Date and ending on Scheduled Completion Date;

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Original construction ’ shall mean the first or initial construction

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Guaranteed Construction Start Date means the Expected Construction Start Date, as such date may be extended by the Development Cure Period.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.