MPF industry developed reference portfolio definition

MPF industry developed reference portfolio means an MPF industry developed reference portfolio to provide a common reference point for the performance and asset allocation of CAF and A65F.

Related to MPF industry developed reference portfolio

  • Reference Portfolio means, the notional portfolio made up of each Reference Asset, as described in this Information Statement under “Reference Portfolio”.

  • Reference Portfolio Return means on any day, the weighted average return of the Reference Assets calculated as the sum of the Weighted Reference Asset Return of each of the Reference Assets comprising the Reference Portfolio.

  • Reference mass means the "unladen mass" of the vehicle increased by a uniform figure of 100 kg for test according to Annexes 4a and 8;

  • Weighted Reference Asset Return means for each Reference Asset contained in the Reference Portfolio and on any day, the product of (i) the Reference Asset Return and (ii) the Reference Asset Weight.

  • Term SOFR Reference Rate means the forward-looking term rate based on SOFR.

  • Reference plane means a plane which is displaced from and parallel to the tomographic plane.

  • Least developed country construction material means a construction material that—

  • Qualified high-technology business means a business that is either of the following:

  • Reference Interconnection Offer or “RIO” means a document published by a service provider specifying terms and conditions on which the other service provider may seek interconnection with such service provider;

  • Gross Asset Value means, with respect to any asset, the asset’s adjusted basis for federal income tax purposes, except as follows:

  • Reference man means a hypothetical aggregation of human physical and physiological characteristics determined by international consensus. These characteristics may be used by researchers and public health workers to standardize results of experiments and to relate biological insult to a common base.

  • Best available control technology (BACT means an emissions limitation (including a visible emission standard) based on the maximum degree of reduction for each pollutant subject to regulation under CAA which would be emitted from any proposed major stationary source or major modification which the Department, on a case-by-case basis, takes into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 7 DE Admin. Code 1120 and 1121. If the Department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results.

  • Reference Asset Weight means, in respect of a Reference Asset, the proportion of the Reference Portfolio set out under the heading “Reference Portfolio Weight” for such Reference Asset in the table included under “THE REFERENCE PORTFOLIO, subject to adjustments that may be made pursuant to “DESCRIPTION OF THE NOTES – Adjustments and Exceptional Circumstances”.