MW Output definition

MW Output has the meaning given to it in the Grid Code;

Examples of MW Output in a sentence

  • Potential Ramping Margin means the increased MW Output and/or MW Reduction that a Providing Unit can provide based on its Technical Offer Data.

  • The Technical Offer Data, Minimum Generation and average MW Output or average MW Reduction of the Providing Unit for that Trading Period and the minimum of the Availability of the Providing Unit from the start of that Trading Period until three hours later form the basis for calculating RM1 Available Volume.

  • Fast Frequency Response (FFR) is the additional MW Output or MW Reduction required compared to the pre-incident MW Output or MW Reduction, which is fully available from a Providing Unit within 2 seconds after the start of an Event and sustainable up to 10 seconds after the start of the Event.

  • The MW Output or MW Reduction and Availability of the Providing Unit for the Trading Period form the basis for calculating FFR Available Volume.

  • The average MW Output or average MW Reduction, average Availability and the RR Reserve Characteristic of the Providing Unit for the Trading Period form the basis for calculating RR Available Volume.

  • The Available Volume of the Providing Unit to provide FPFAPR in a Trading Period is the product of the average MW Output exported by the Providing Unit for the Trading Period and the average Declared Availability to provide FPFAPR for the Trading Period.

  • Fast Post‐Fault Active Power Recovery is the recovery of a Providing Unit’s MW Output to at least 90% of its pre‐Fault Disturbance MW Output within 250ms of the voltage at the Providing Unit’s Connection Point recovering to at least 90% of its pre‐Fault Disturbance value for any Fault Disturbance that is cleared within 900ms.

  • Ramping Margin 8 Ramping Margin 8 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within eight hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further eight hours after the eight hour period has elapsed.

  • Each of these services is covered in turn below: Ramping Margin 1 Ramping Margin 1 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within one hour of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further two hours after the one hour period has elapsed.

  • Ramping Margin 3 Ramping Margin 3 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within three hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further five hours after the three hour period has elapsed.

Related to MW Output

  • Output means the exposure rate, dose rate, or a quantity related in a known manner to these rates from a brachytherapy source or a teletherapy, remote afterloader, or gamma stereotactic radiosurgery unit for a specified set of exposure conditions.

  • Outputs means the goods or services that are produced by an entity or other person;

  • voltage means the root-mean-square value of electrical potential between two conductors.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Fuel means any solid, liquid or gaseous combustible material;