Net Unit Electrical Output Test definition

Net Unit Electrical Output Test has the meaning set forth in Section 11.5(b).
Net Unit Electrical Output Test means the electric output test or tests that are performed in accordance with Section 11.5(d)(i).
Net Unit Electrical Output Test has the meaning set forth in Section 11.5(b). "NRC" means the U.S. Nuclear Regulatory Commission and its staff. [**]

Examples of Net Unit Electrical Output Test in a sentence

  • If the Unit does not meet the Net Unit Electrical Output Guarantee due to Contractor's fault, Owner's remedy for such failure shall be to recover from Contractor Performance Liquidated Damages of two thousand dollars ($2,000) for each whole KWe that the Net Unit Electrical Output, as demonstrated by a Net Unit Electrical Output Test, is below the Net Unit Electrical Output Guarantee.

  • In accordance with APP-GW-T1R-600, (AP1000 Performance Test Requirements and Bases), the Performance Tests [***] shall consist of the following tests: (i) Net Unit Electrical Output Test, (referred to as the Turbine Generator Output Test in APP-GW-T1R-600), (ii) Moisture Carryover Test, and (iii) the Cooling Tower Performance Test.

  • Contractor shall be entitled to invoice the Owner for any bonus earned following completion of the Net Unit Electrical Output Test, and payment from Owner shall be due within thirty (30) days following receipt of such invoice.

  • The Net Unit Electrical Output Test shall consist of at least four (4) test runs of a minimum of two (2) hours in duration per test run.

  • Subject to the limits of liability on liquidated damages set forth in Section 11.5(d)(ii)(B) and subject to the provisions in Section 11.5(d)(ii)(C) and Section 11.5(d)(iv), Contractor guarantees that each Unit, when loaded with the Nuclear Fuel and operated in accordance with Operating Procedures and Maintenance Procedures and Facility Manuals, shall produce the Net Unit Electrical Output of [***] MWe as evidenced by the Net Unit Electrical Output Test (the “ Net Unit Electrical Output Guarantee ”).

  • The measurement frequency shall be in compliance with PTC-46 throughout the Net Unit Electrical Output Test.

  • In the event that the Net Unit Electric Output, as determined by the Net Unit Electrical Output Test, exceeds the Net Unit Electrical Output Guarantee, then Contractor shall be entitled to receive as a bonus an amount equal to [***].

  • The Net Unit Electrical Output Test for each Unit shall be conducted in material compliance with Power Test Code 46 (PTC-46) with the Net Unit Electrical Output [***] for the periods and duration described in this Section 11.5(d)(i).


More Definitions of Net Unit Electrical Output Test

Net Unit Electrical Output Test shall be run to determine whether the Unit meets the Net Unit Electrical Output Guarantee [***]. The Net Unit Electrical Output Test for each Unit shall be conducted in material compliance with Power Test Code 46 (PTC-46) with the Net Unit Electrical Output [***] for the periods and duration described in this Section 11.5(d)(i). The Net Unit Electrical Output Test shall consist of at least four (4) test runs of a minimum of two (2) hours in duration per test run. Upon evaluation of the data, if three (3) or more of the test runs are found invalid, additional runs will be made after required remedial work, if any, is performed by the responsible Party. The measurement frequency shall be in compliance with PTC-46 throughout the Net Unit Electrical Output Test. Data collected within each test run will be averaged after each of the results is corrected to guarantee reference conditions in accordance with PTC-46, and then the Net Unit Electrical Outputs from the test runs that are found valid shall be averaged for purposes of determining the applicable Net Unit Electrical Output liquidated damages and bonuses.

Related to Net Unit Electrical Output Test

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Market Participant Energy Injection means transactions in the Day-ahead Energy Market and Real-time Energy Market, including but not limited to Day-ahead generation schedules, real- time generation output, Increment Offers, internal bilateral transactions and import transactions, as further described in the PJM Manuals.

  • Measurement Point means the emission source for which continuous emission measurement systems (CEMS) are used for emission measurement, or the cross-section of a pipeline system for which the CO2 flow is determined using continuous measurement systems;

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Electrical Distance means, for a Generation Capacity Resource geographically located outside the metered boundaries of the PJM Region, the measure of distance, based on impedance and in accordance with the PJM Manuals, from the Generation Capacity Resource to the PJM Region.

  • Electrical work Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” xxxx modular electrical accessories, Landline phone conduit, Cable TV wiring conduit, Separate line for inverter connection, Air-conditioner power point. Painting : Long Lasting and weather resistant acrylic paint to all external walls, All internal walls with white cement based putty finish with OBD. Plumbing & Sanitation : Sanitary xxxx for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen: Granite platform, ceramic tiles dado upto 2’ height, Stainless Steel sink in Kitchen, Aquaguard point, Connection for washing machine in wash area.

  • Net metering system means a facility for the production of electrical energy that does all of the following:

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;

  • Generation Unit means a facility that converts a fuel or an energy resource into electrical energy.

  • Working voltage means the highest value of an electrical circuit voltage root-mean-square (rms), specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating conditions. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.

  • Subprojects means more than one such Subproject.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Calibration gas means a gas mixture used to calibrate gas analysers.

  • Blend means seed consisting of more than one variety of a kind, each in excess of five percent by weight of the whole.

  • low voltage means the set of nominal voltage levels that are used for the distribution of electricity and whose upper limit is generally accepted to be an a.c. voltage of 1000V ( or a d.c. voltage of 1500 V). [SANS 1019]

  • Used water means any water supplied by a public water supply system to a consumer's water system after it has passed through the service connection and is no longer under the control of the water supply official custodian.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Bottled water means water that is placed in a safety sealed container or package for

  • medium voltage means the set of nominal voltage levels that lie above low voltage and below high voltage in the range of 1 kV to 44 kV;

  • Day-ahead System Energy Price means the System Energy Price resulting from the Day- ahead Energy Market.

  • Cubic foot of gas means the amount of gas required to fill a cubic foot of space when the gas is at an absolute pressure of fourteen and seventy-three hundredths (14.73) pounds per square inch at a temperature of sixty (60) degrees Fahrenheit.

  • Design pressure means the hydrostatic pressure for which each structure or appliance assumed watertight in the intact and damage stability calculations is designed to withstand.