Port Limit definition

Port Limit means the limits of Port of Chennai notified by the Central Government in terms of Section 4 (2) of the Indian Ports Act, 1908.
Port Limit means the boundary limits of the port as notified by the Central Government in the Gazette of India in terms of Section 4 (2) of the Indian Ports Act, 1908.
Port Limit means the limit of a port as declared pursuant to

Examples of Port Limit in a sentence

  • The tides are crucial for navigation since they affect whether or not it is possible to pass the shallow area between Kutubdia points and the Karnaphuli entrance and the bars within the Port Limit.

  • The team used the Checklist Analysis method to identify marine accident scenarios between sand carrier/tug, barge and commercial marine vessel within Tanjung Pelepas Port Limit.

  • She will establish a corner in the house where she can give counselling or treat minor illnesses in privacy.

  • Meanwhile, the Risk Index of Tanjung Pelepas Port Limit is presented in Table 6.

  • The elevation of the landfill bottom is around 500m−502 m, and after the landfill is sealed, the top elevation is about 520−525 m.

  • All applicable Borough of Roselle Park ordinances will be enforced. Bouncy house must fulfill requirements set forth by the borough.

  • Acenapthalene, fluorene, 1-methylnapthalene, 2-methylnapthalene, naphthalene, and phenanthrene were detected in samples HC-11 and HC-13 at concentrations ranging from 3.58 to 172 μg/L.

  • However, under strict conditions the facility may actually be able to upgrade and expand.15 The ports Out Port Limit Services (OPL) consisting of crew changes services, supplying goods and spare parts shall remain acting in competition to possible new services from Hambantota.

  • Serving vessels at Fujairah Off Port Limit is strictly not allowed and against Port Security Regulations.

  • Users are also to refrain from sampling at sites very close to the Port Limit.


More Definitions of Port Limit

Port Limit means the limit of a port as declared pursuant to section 3A(2);
Port Limit means a limit as set out in the order of the Minister in section 5 and 6 of the Ordinance
Port Limit means the limits as prescribed in the Port Limits Regulations, 2010 issued under the National Ports Act, 2005 (Act No. 12 of 2005);
Port Limit means the area of land and waters located within the Port Zone, the boundary of which is to be determined by Infrastructure Owner and Infrastructure Operator and approved by the Foundation Customer and the State in the course of preparation of the Infrastructure BFS.
Port Limit means the boundary determined, by notification, under sub-section(a) of section 5;

Related to Port Limit

  • Transportation network company driver or “driver” means an

  • port townsite means the townsite to be established pursuant to this Agreement near the harbour;

  • Transportation network company rider or “rider” means an

  • Transportation network company means a corporation,

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Said Flat means the Flat No. on the Floor admeasuring an area of sq.ft. ( sqm) Carpet Area/Saleable area along with garage/closed parking no. admeasuring an area of sq.ft. at “Varada Moana” situated at 000 X, Xxxx Xxxxxx Xxxxxxx Xxxxxxx Road, P.S. Netaji Nagar, Xxxx no.100 under Borough X, Xxxxxxx 000000, more fully described in PART-I of the SECOND SCHEDULE hereto.

  • Maximum allowable residential density means the density allowed under the zoning ordinance and land use element of the general plan, or if a range of density is permitted, means the maximum allowable density for the specific zoning range and land use element of the general plan applicable to the project. Where the density allowed under the zoning ordinance is inconsistent with the density allowed under the land use element of the general plan, the general plan density shall prevail.

  • Fire Department means an organized fire department as that term is defined in section 1 of the fire prevention code, 1941 PA 207, MCL 29.1.

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).

  • Host At Destination means the person with whom the Insured is sharing prearranged overnight accommodations in the host's home.

  • Radio frequency identification (RFID means an automatic identification and data capture technology comprising one or more reader/interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.

  • Maximum allowable cost list means the list of drugs used by a pharmacy benefit manager that

  • Outer burial container means any container which is designed for placement in the ground around a casket or an urn including but not limited to containers commonly known as burial vaults, urn vaults, grave boxes, grave liners, and lawn crypts.

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • IWAI/ Authority/ Department/ Owner means the Inland Waterways Authority of India, which invites tenders on behalf of the Chairman, IWAI and includes therein-legal representatives, successors and assigns.

  • Diameter at Breast Height (DBH) means the diameter of a tree at 4 1/2 feet above the ground measured from the uphill side.

  • DOT means the United States Department of Transportation.

  • Local Utility Services XOOM is an independent retail marketer of natural gas & electricity and is not affiliated with your local utility. Your local utility will continue to deliver your gas, read your meter, send you a bill, and make necessary repairs. Your local utility will also respond to emergencies and provide other basic utility services as required. XOOM Energy is not an agent of your local utility and your utility will not be liable for any of XOOM Energy’s acts, omissions, or representations. Price: Your rate for gas purchases will be a fixed price of $0.5990 per therm, plus taxes and fees, if applicable, and a monthly administrative fee of $2.99. You will continue to be responsible for all charges assessed and billed by your local utility for all services it provides, including any other fees or taxes specifically associated with services it continues to provide during the term of this Agreement, including transportation charges payable for Core Aggregation Service.

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Poverty line means the poverty line established by the director of the United States office of management and budget as revised by the secretary of health and human services in accordance with section 673(2) of the "Community Services Block Grant Act," 95 Stat. 1609, 42 U.S.C.A. 9902, as amended.

  • Traffic lane or "lane" means that portion of a roadway designed or designated to accommodate the

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • 5555551212 Registrant Phone Ext 1234 Registrant Fax: +1.5555551213 Registrant Fax Ext: 4321 Registrant Email: XXXXX@XXXXXXX.XXX Admin ID: 5372809-­‐ERL Admin Name: EXAMPLE REGISTRANT ADMINISTRATIVE Admin Organization: EXAMPLE REGISTRANT ORGANIZATION Admin Street: 000 XXXXXXX XXXXXX Admin City: ANYTOWN Admin State/Province: AP Admin Postal Code: A1A1A1 Admin Country: EX

  • Location Routing Number (LRN means the ten (10) digit number that is assigned to the network switching elements (Central Office–Host and Remotes as required) for the routing of calls in the network. The first six (6) digits of the LRN will be one of the assigned NPA NXX of the switching element. The purpose and functionality of the last four (4) digits of the LRN have not yet been defined but are passed across the network to the terminating switch.