Examples of Preliminary Project Design in a sentence
The Preliminary Project Budget reflects the preliminarily estimated cost of construction of the Project based on the Preliminary Project Design, as discussed in Section 4.2. The all-inclusive Final Project Budget shall continue to include all direct and indirect costs as well as contingencies consistent with industry standards.
Theaward came in a class-action trial of 700,000 members, with individual liability and compensatory damages to be decided in later proceedings.
The Project’s Preliminary Project Design is attached hereto as Exhibit C.
Step 11: Develop Preliminary Project Design and Construction CostsPreliminary facility project costs can and should be esti- mated at this stage using information now available.
The Director reported that he had reviewed the Preliminary Project Design Reports from Picciola and Associates and received an estimated cost from them to consider an interim alternative (Phase A) that resections the levee to 6.5’ (which is above the current average) in order to make the cost more attainable.
The Project’s Preliminary Project Design is attached hereto as Exhibit G.
The project’s geotechnical report shall be included within the Preliminary Project Design Report and include soil classifications, N values, water levels, proctors, CBR’s, pavement design, and testing recommendations.
PWRF will construct the PWR Museum on the Site substantially consistent with the Final Project Design as evolved from the Preliminary Project Design provided in Exhibit G, at a currently estimated total cost of approximately _ to ( – ).
Conceptual Design: 120 calendar days after the authorization to commence planning Preliminary Project Design: 240 calendar days after authorization to commence PPD Final Design: 300 calendar days after authorization to commence final design Note: Environmental Permitting and Monitoring is ongoing and is anticipated to last a minimum of five years.
Products:• Preliminary Project Design Documentation• Design Build Contract• Initial Planning and Procurement Presentation Subtask 2.2 Multi-Storage LDES Solar Microgrid Design, Engineering, and ApprovalsThe goals of this subtask are to complete the engineering designs and obtain approvals enabling construction to proceed.