Longstop Date means 20 September 2020;
Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity
Project Completion Date means the date on which the Completion Certificate is issued;
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
Stop Date shall have the meaning specified in Subsection 2.04(a).
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
Scheduled Completion Date shall be the date set forth in Clause 10.3;
Target Completion Date has the meaning given such term in Section 3.3(b).
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Substantial Completion Date means the date on which Substantial Completion occurs.
Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.
Long Stop Date has the meaning set forth in Clause 4.3.2;
Construction Completion means physical construction of a cleanup action component is complete.
Outside Completion Date shall have the meaning assigned to such term in Section 6.3(d).
The Completion Date means the date of completion of the Works as certified by the Employer’s Representative.
Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.
Infrastructure facility means a building; structure; or networks of buildings, structures, pipes, controls, and equipment, or portion thereof, that provide transportation, utilities, public education, or public safety services. Included are government office buildings; public schools; courthouses; jails; prisons; water treatment plants, distribution systems, and pumping stations; wastewater treatment plants, collection systems, and pumping stations; solid waste disposal plants, incinerators, landfills, and related facilities; public roads and streets; highways; public parking facilities; public transportation systems, terminals, and rolling stock; rail, air, and water port structures, terminals, and equipment.
Original Project means the Project described in the Original Financing Agreement.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Final Completion Date means the date on which Final Completion occurs.
COMPLETION TIME means the period by ‘date/month’ specified in the ‘Letter of Intent/Award’ or date mutually agreed upon for handing over of the intended scope of work, the erected equipment/plant which are found acceptable by the Engineer, being of required standard and conforming to the specifications of the Contract.
Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.
Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;
Completion Period means the period starting from the date of issue of "Order" and required to complete the work in all respect.
Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.
Framework Commencement Date means [insert date dd/mm/yyyy];