Project Output Profile definition

Project Output Profile means the table attached to this Agreement as part of the Payment Trigger Calculator set out at Part 2 of Schedule 5 providing a month by month profile of the Project's forecast starters, pathway activities and Outputs and Results, together with the unit rate to be applied to these and the forecast claim amount for each month of the Project;

Related to Project Output Profile

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Subprojects means more than one such Subproject.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • The Works/Project means the works to be executed or done under this contract.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Construction Services Agreement means this Construction Services Agreement, together with any duly authorized and executed amendments hereto.

  • Development Project means a project for the development of land within a

  • Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Project Scope means the description or activity of work to be accomplished on the Project.

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Train Loading Infrastructure means conveyors, stockpile areas, blending and screening facilities, stackers, re‑claimers and other infrastructure reasonably required for the loading of iron ore, freight goods or other products onto the relevant Railway for transport (directly or indirectly) to a loading port; and

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • Project Milestones means the project milestones set forth in Schedule-G;

  • EPC Contractor means Seller’s engineering, procurement and construction contractor or such Person performing those functions.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Compression Ignition Engine means an internal combustion engine with operating characteristics significantly similar to the theoretical diesel combustion cycle. The regulation of power by controlling fuel supply in lieu of a throttle is indicative of a compression ignition engine.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Green infrastructure means a stormwater management measure that manages stormwater close to its source by:

  • Project Deliverables means the Project deliverables set out in Schedule 2. Project Material means all the material including but not limited to documents, computer software, and data stored by any means which is created by the Fellow in the course of undertaking the Project.

  • Project Data means all proprietary data of the Project generated out of the Project operations and transactions, documents and related information including but not restricted to user data which the Bidder obtains, possesses or processes in the context of providing the Services to the users pursuant to this RFP including the SLA;

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point: