Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.
Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.
Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);
Subproject means a specific project to be carried out by an existing BE utilizing the proceeds of a Sub-loan or Investment, as hereinafter defined, fulfilling the conditions set forth in Part A of Schedule 4 to this Agreement;
EPC Contractor means the contractor responsible for engineering, procurement and construction of the Facility, including Seller if acting as contractor, and including all subcontractors.
Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).
Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.
Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".
Project Milestones means the project milestones set forth in Schedule-G;
Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.
Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).
S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.
Project Milestone means the project milestone set forth in Schedule-J;
Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.
Service Level means the standard set forth below by which IBM measures the level of service it provides in this SLA.
Control Performance Standard or “CPS” shall mean the reliability standard that sets the limits of a Balancing Authority’s Area Control Error over a specified time period.
Service Levels means the service levels to be met by the Services as referenced in the Contract Letter and set out in the Specification Schedule.
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.
Key Performance Indicator means a measure that captures the performance of a critical variable to expand and improve community-based corrections programs to promote offender success, ensure accountability, enhance public safety, and reduce recidivism.
Project Scope means the description or activity of work to be accomplished on the project.
Performance Review means a summative evaluation of a teacher other than a beginning teacher and used to determine whether the teacher’s practice meets school district expectations and the Iowa teaching standards, and to determine whether the teacher’s practice meets school district expectations for career advancement in accordance with Iowa Code section 284.7.
Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.
energy performance contracting means a contractual arrangement between the beneficiary and the provider of an energy efficiency improvement measure, verified and monitored during the whole term of the contract, where investments (work, supply or service) in that measure are paid for in relation to a contractually agreed level of energy efficiency improvement or other agreed energy performance criterion, such as financial savings;
Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.
Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).