Project Thunder definition

Project Thunder means the fundamental changes described on Schedule 7.02(c).
Project Thunder means the fundamental changes described on Schedule 7.02(c) to the New Senior Credit Agreement (as in effect on May 27, 2022).

Examples of Project Thunder in a sentence

  • A Public Hearing was held on a request for approval of an Economic Incentive Grant for Project Thunder (Chick-fil-A).

  • Ruby also provided the ability to load dynamic link libraries containing additional controls (then called "gizmos"), which later became the VBX interface.Timeline of Visual Basic (VB1 to VB6) Project 'Thunder' was initiated Visual Basic 1.0 (May 1991) was released for Windows at the Comdex/Windows World trade show in Atlanta, Georgia.

  • In connection with Project Thunder and the potential transaction involving PalletOne, we kindly request copies of the documents and related information as set forth below.

  • Mineral resource endowment and platinum-equivalents are quoted pursuant to the Technical Report and Mineral Resource Estimate for the Thunder Bay North Project, Thunder Bay, Ontario, with an effective date of January 20, 2021 (the "Technical Report").

  • Irving 1983-86 Director, Cummins site Archaeological Project, Thunder Bay, Ontario Doctoral Research, University of Toronto 1988-90 University of Toronto Post-doctoral Research Fellowship, Paleoindian and Archaic research in Great Lakes Region, Funded by SSHRC 1989 Technological Analyses of Sheguiandah Site Lithic Assemblages, SSHRC 1990 SEM Use-wear Analysis of Sheguiandah Site Lithic Assemblages, SSHRC 1991 Sheguiandah Site Geochronology and Geoarchaeology, Laurentian Univ.

  • Project Thunder: L.E.K. Final Report Dated March 18, 2014 (“Final Report”) We are writing to confirm the terms upon which we are prepared to disclose a copy of the Final Report to you.

Related to Project Thunder

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Design torso angle means the angle measures between a vertical line through the "R" point and the torso line in a position which corresponds to the design position of the seat-back established by the vehicle manufacturer;

  • Project Title PROJECT LOCATION: PROJECT NO.:

  • Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Non-transient non-community water system means a public water system that is not a community water system and that regularly serves at least 25 of the same persons over 6 months per year.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Caribbean Basin country construction material means a construction material that—

  • Project Management Unit and “PMU” each means the Recipient’s unit responsible for the implementation of its Respective Part of the Project referred to in Section I.A.2 of Schedule 2 to this Agreement.

  • Research and development facility means an establishment engaged in laboratory, scientific, or experimental testing and development related to new products, new uses for existing products, or improving existing products. The term does not include an establishment engaged in efficiency surveys, management studies, consumer surveys, economic surveys, advertising, promotion, banking, or research in connection with literary, historical, or similar projects.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

  • Transient non-community water system or “transient non-CWS” means a non- CWS that does not regularly serve at least 25 of the same persons over six months of the year.

  • Existing development means development, other than that associated with agricultural or forest management activities, that meets one of the following criteria:

  • Environmental Management Framework or “EMF” means the policy framework for environmental management, approved by the Project Implementing Entity’s Board of Directors on July 21, 2009, which sets forth the environmental policies and procedures that shall apply to the carrying out of the Project.

  • Initial Development Plan has the meaning set forth in Section 3.2(b).

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Economic development project means land and existing or planned improvements suitable for use by an industrial or commercial enterprise, or housing development, or the protection of the environment, including, but not limited to, groundwater or surface water. Economic development project includes necessary buildings, improvements, or structures suitable for and intended for or incidental to use as an industrial or commercial enterprise or housing development; and includes industrial park or industrial site improvements and port improvements or housing development incidental to an industrial or commercial enterprise; and includes the machinery, furnishings, and equipment necessary, suitable, intended for, or incidental to a commercial, industrial, or residential use in connection with the buildings or structures.

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.