Project Water Rights definition

Project Water Rights means: (1) The rights of the Association adjudicated under Decree Xx. 000, Xxxxxxxx Xx. 000 ¼, on June 1, 1901, in the amount of 1,300 cubic feet per second (cfs). The South Canal Drop 5 hydroelectric power project will rely upon these existing water rights held by the United States for the sole use and benefit of the Association, as defined below: In Case No. CA1945 in Water Division 4, 1,300 cfs absolute was decreed “for the sole use, diversion, and benefit of the [Uncompahgre] project.” The water right has an appropriation date of June 1, 1901, and an adjudication date of May 8, 1913. The priority number for the water right is 111 ¼. a. In 1984, the Division Engineer placed 250 cfs of the 1,300 cfs on the abandonment list. In Case No. 84CW142, the Association protested the abandonment of the 250 cfs, and in a stipulation, agreed to have 239 cfs designated as conditional in return for the Division Engineer’s withdrawal of the 250 cfs from the abandonment list. b. In Case No. 86CW01, 61 cfs of the 239 cfs was made absolute. In Case No. 87CW231, 13 cfs was made absolute. In Case No. 94CW33, 40 cfs was made absolute. As of January 2010, 1,175 cfs absolute and 125 cfs conditional comprise the Association’s 1,300 cfs right. (2) No new rights will be appropriated for the operation of this Facility. (3) Any water from other sources that may from time to time be available for power generation.
Project Water Rights means the Water Rights necessary and sufficient to operate the Project consistent with the Specifications, providing not less than acre-feet of water annually.
Project Water Rights has the meaning set forth in the Recitals. “RCA” has the meaning set forth in Section 2.2(c).

Examples of Project Water Rights in a sentence

  • Shares of Preferred Stock shall not be convertible into or exchangeable for any other property or securities of the Company, except as provided in the Articles Supplementary and except that the Preferred Stock will automatically be exchanged by the Company for Excess Stock in accordance with Article VI of the Charter in the same manner that Common Stock are exchanged for Excess Stock pursuant thereto, in order to ensure that the Company remains qualified as a REIT for federal income tax purposes.

  • Such request for proposals shall state that IPA is not obligated to sell or otherwise dispose of such Project Water Rights, but rather, may elect to do so based upon the purchase or other acquisition proposals submitted in respect thereto.

  • In determining the Retirement Salvage Proceeds of Project Water Rights allocable to a Project Component pursuant to Section 23.3 as to which IPA makes an election under Section 24.1, IPA shall issue a request for proposals to water users within the basin or watershed to which such water rights relate for the purchase or other acquisition of such water rights.

  • The Parties acknowledge that the PVWP Agreement grants LSP a 50% undivided interest in the Project Water Rights and a 50% voting right with respect to certain decisions related to Project construction and operation.

  • Windy Gap Project Water Rights Decrees Update Northern Water President Applegate next requested an update on the Windy Gap Project water rights decrees.

  • Nothing herein shall change or dilute LSP’s interest in Project Water Rights or Project Infrastructure, or LSP’s rights, including voting rights, with respect to construction and operation of the Project pursuant to the PVWP Agreement.

  • The Owners shall make available and allow AWWU to continue to interconnect the AWWU Water Project to the Eklutna Hydroelectric Project, use the project’s intake, tunnel, and other Owners’ Facilities necessary to divert and use a portion of Project Water Rights up to 41 million gallons per day for public water supply purposes in a manner consistent with AWWU’s Preferred Use Status, the AWWU Water Permit, and Alaska Statute 46.15.150(b).

  • The intent of these activities is to allow the Project Participants to plan for the conveyance, storage, and treatment infrastructure needed for each entity to best carry, store, deliver and utilize the Collective Project Water Rights in the Oversized Project Infrastructure.

  • Dan Fua)Review draft letter and approve for sending to Mr. Tom Howard, Executive Director, State Water Resources Control Board, regarding the U.S. Bureau of Reclamation’s Water Year 2011 Interim Flows Project Water Rights Permit – Condition 15 – San Joaquin River Restoration Program.

  • Nevada State Engineer GWD Project Water Rights Administrative Review20 Process 2221 STANDARD OF REVIEW 2422 ARGUMENT 2523 I.

Related to Project Water Rights

  • Water Rights means: (1) with respect to any Person, all of such Person’s right, title and interest in and to any water stock, permits or entitlements and any other water rights related to or appurtenant to property owned or leased by such Person, and (2) with respect to any property, any water stock, permits or entitlements and any other water rights related to or appurtenant to such property.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Water right means a legal authorization, such as a permit, claim, or other authorization, on record with or accepted by the department of ecology, authorizing the beneficial use of water in accordance with all applicable state laws.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;

  • Wastewater System means a system of wastewater collection, treatment,

  • Power plant means a facility for the generation of

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Mixed-use project means a project comprising both a qualified

  • Project Common Areas as used in this Lease, shall mean the portion of the Project designated as such in the Site Plan. The Project Common Areas shall consist of all parking facilities, entrances and exits, driveways, exterior walkways, first-class landscaped and hardscaped areas which are generally consistent with the quality of landscaped and hardscaped areas of Comparable Buildings in existence as of the date of this Lease, open space areas and plazas on the real property comprising the Project. The term "BUILDING COMMON AREAS," as used in this Lease, shall mean the portions of the Common Areas located within any building in the Project not entirely leased by Tenant, which Building Common Areas shall be reasonably designated as such by Landlord. Notwithstanding the foregoing and subject to (i) Landlord's approval, which approval (as indicated in Section 29.4 below) shall not be unreasonably withheld or delayed, (ii) the CC&R's, and (iii) all terms of this Lease regarding Hazardous Materials, Tenant may install or locate such items as benches, patio tables, bike racks, above-ground generators, security cameras and the like (collectively, "MISCELLANEOUS COMMON AREA ITEMS") at Tenant's sole cost in the Common Areas or on the exterior of the Building, as applicable, provided that Tenant removes such items upon the expiration or earlier termination of this Lease and repairs any damage to the Common Areas or the exterior of the Building (as applicable) resulting from such removal. If Tenant fails to remove any Miscellaneous Common Area Item or to repair any damage resulting from such removal upon the expiration or earlier termination of this Lease, Landlord may do so and may charge Landlord's actual cost thereof to Tenant. The manner in which the Common Areas are maintained and operated shall be in accordance with a standard which is not less than that customarily followed in the operation and maintenance of first class mid-rise office buildings located within the University Towne Center (i.e., the area from two (2) blocks to the North of La Jolla Village Drive to two (2) blocks to the South of La Jolla Village Drive between the I-5 and I-805 freeways), Del Mar, Carmel Valley and Torrey Hills geographical areas, provided that Landlord shall manage, maintain and operate the same in a manner consistent with that of Comparable Buildings, and the use thereof shall be subject to such rules and regulations as Landlord reasonably may make from time to time. As used herein, "COMPARABLE BUILDINGS" shall mean the first class mid-rise office buildings (now existing or subsequently constructed) within the projects located within the University Towne Center, Del Mar, Carmel Valley and Torrey Hills geographical areas and having substantially similar characteristics to the Building pertaining to size, age, accessibility, design, quality, amenities and tenancies. Landlord reserves the right to make alterations or additions to, or to change the location of, elements of the Project and the Common Areas, provided that if any such changes might affect Tenant's use of the Premises (in other than an immaterial manner), Landlord obtains Tenant's prior written approval of any such alterations, additions and changes and such alterations, additions and changes do not unreasonably interfere with Tenant's access to the Premises. Except when and where Tenant's right of access is specifically excluded in this Lease, Tenant shall have the right of access to the Building and the parking facilities twenty-four (24) hours per day, seven (7) days per week during the Lease Term. PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Project Area means land or lands located within the incentive

  • Permit area means the area constituted by the blocks that are the subject of a permit;

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Project area plan means a written plan that, after its effective date, guides and controls the development within a project area.

  • Environmental Infrastructure Facilities means Wastewater Treatment Facilities, Stormwater Management Facilities or Water Supply Facilities (as such terms are defined in the Regulations).

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Surface water means all water which is open to the atmosphere and subject to surface runoff.

  • The Works/Project means the works to be executed or done under this contract.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.