Reconstruction Costs definition

Reconstruction Costs means the costs advanced by Tenant, if any, to perform Landlord's repairs up to the same level of fit and finish that existed immediately prior to the casualty damage if and to the extent that Tenant specifically has been granted the right in this Article 16 to advance such costs. Reconstruction Costs shall not include any costs to repair or replace Tenant's Work, Tenant's Property or any Alterations, nor any advances that are subsequently repaid to Tenant (whether by insurance or otherwise).
Reconstruction Costs means, with respect to a Loss Occurrence, collectively, all costs and expenses that are (a) incurred by Owner to reconstruct or otherwise repair the Northern Pass Transmission Line following such Loss Occurrence, net of insurance proceeds and other amounts received by Owner in connection therewith (excluding any proceeds of any liability insurance policy or any insurance proceeds or other amounts payable to any Financing Party, unless such amounts payable are permitted under the applicable Loan Documents to be applied to such Loss Occurrence), and (b) recoverable under the Formula Rate in accordance with Article 8.
Reconstruction Costs means all costs associated with the reconstruction and recovery of a loss, including but not limited to, salary expense of staff, postage expenses, stop payment fees, reasonable attorneys' fees and court costs and other out-of -pocket expenses.

Examples of Reconstruction Costs in a sentence

  • D.1 Additional Project Eligibility Requirements 127 D.2 Eligible Mitigation Reconstruction Costs 127 D.2.1 Eligible Demolition/Removal Activities 129 D.2.2 Ineligible Mitigation Reconstruction Costs 130 D.3 Additional Information about the Feasibility and Effectiveness Requirement 130 D.4 Mitigation Reconstruction Project Scoping 130 D.4.1 Design Parameters.

  • Reconstruction Costs measure the cost of rebuilding lost assets and restoring lost services.

  • Table 2: Preliminary Estimate of Total Losses and Reconstruction Costs as of November 10, 2005 Sector Direct Damage (Rs. mill.) Indirect Losses (Rs. mill.) Reconstruction Costs*(Rs. mill.) Reconstruction Costs*(US$ mill.)Share of Total Reconst.Costs (%)1.

  • Table 2: Preliminary Estimate of Total Losses and Reconstruction Costs as of November 10, 2005 Sector Direct Damage (Rs. mill.) Indirect Losses (Rs. mill.) Reconstruction Costs*(Rs. mill.) Reconst.

  • D.1 Additional Project Eligibility Requirements 140 D.2 Eligible Mitigation Reconstruction Costs 140 D.2.1 Eligible Demolition/Removal Activities 142 D.2.2 Ineligible Mitigation Reconstruction Costs 143 D.3 Additional Information about the Feasibility and Effectiveness Requirement 143 D.4 Mitigation Reconstruction Project Scoping 143 D.4.1 Design Parameters.

  • The economic impact of the earthquake includes the following three costs: (i) Direct Damage; (ii) Indirect Losses; and (iii) Reconstruction Costs.

  • Arnold, “The Canadian International Tax System: Review and Reform” (1995) 43:5 Canadian Tax Journal 1792-1818; firoz Ahmed, “Selected Issues Relating to the 1995 foreign Affiliate Amendments,” International Tax Planning feature (1995) 43:6 Canadian Tax Journal 2142-67; Allan R.

  • Equally, line ministries should establish the level of financial costs that can be absorbed from sector budgets.Executive Summary / 3 Table 2: Summary of Indicative Recovery and Reconstruction Costs (US$ million) SectorShort TermMedium to Long TermTotalTransport5.8428.8134.65aWater & sanitation0.744.505.24bAgriculture2.902.735.63cHousing2.62 2.62Health & education1.495.426.91Total13.5941.4655.03Source: Estimates are based on official data from the Solomon Islands government.

  • Reconstruction Costs establishment of appropriate systems and procedures, and development of the requisite institutional capacity at local agencies, took pla ce.

  • Table 1: Preliminary Estimate of Total Losses and Reconstruction Costs as of November 10, 2005 SectorDirect Damage (Rs. mill.)Indirect Losses (Rs. mill.)Reconstruction Costs*(Rs. mill.)Reconstruction Costs*(US$ mill.)Share ofTotal Reconst.


More Definitions of Reconstruction Costs

Reconstruction Costs means, with respect to a Loss Occurrence, collectively, all costs and expenses that are (a) incurred by Owner to reconstruct or otherwise repair the Northern 1014917.31-D.C. Server 1A - MSW EXECUTION COPY Pass Transmission Line following such Loss Occurrence, net of insurance proceeds and other amounts received by Owner in connection therewith (excluding any proceeds of any liability insurance policy or any insurance proceeds or other amounts payable to any Financing Party, unless such amounts payable are permitted under the applicable Loan Documents to be applied to such Loss Occurrence), and (b) recoverable under the Formula Rate in accordance with Article 8.

Related to Reconstruction Costs

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Remediation Costs means the cost of any action taken to reduce the concentration of contaminants on, in or under the Eligible Property to permit a record of site condition to be filed in the Environmental Site Registry under section 168.4 of the Environmental Protection Act and the cost of complying with any certificate of property use issued under section 168.6 of the Environmental Protection Act, as further specified in the CIP.

  • Production Costs means those costs and expenditures incurred in carrying out Production Operations as classified and defined in Section 2 of the Accounting Procedure and allowed to be recovered in terms of Section 3 thereof.

  • Building Operating Expenses means the portion of "Operating Expenses," as that term is defined in Section 4.2.7 below, allocated to the tenants of the Building pursuant to the terms of Section 4.3.1 below.

  • Reconstruction means the replacement of components of an existing facility to such an extent that:

  • Operating Costs means the incremental expenses incurred by the Recipient on account of Project implementation, management, and monitoring, including for office space rental, utilities, and supplies, bank charges, communications, vehicle operation, maintenance, and insurance, building and equipment maintenance, advertising expenses, travel and supervision, salaries of contractual and temporary staff, but excluding salaries, fees, honoraria, and bonuses of members of the Recipient’s civil service.

  • Project Expenses means usual and customary operating and financial costs. The term does not include extraordinary capital expenses, development fees and other non-operating expenses.

  • Acquisition Costs means all fees, costs, expenses, stamp, registration or transfer Taxes incurred by the Group in connection with the Acquisition.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Relocation Costs means costs incurred in the relocation of the furniture, fixtures, equip- ment, machinery and supplies, including, but not limited to, the cost of dismantling and reassembling equipment and the cost of floor preparation necessary for the reassembly of the equipment. Relocation costs include only such costs that are incurred during the ninety-day period immediately following the commencement of the relocation to an eli- gible premises. Relocation costs do not include costs for structural or capital improve- ments or items purchased in connection with the relocation.

  • Transition Costs means the reasonable costs and expenses (including reasonable attorneys’ fees but excluding overhead) incurred or payable by the Successor Servicer in connection with the transfer of servicing (whether due to termination, resignation or otherwise), including allowable compensation of employees and overhead costs incurred or payable in connection with the transfer of the Receivable Files or any amendment to the Sale and Servicing Agreement required in connection with the transfer of servicing.

  • Restoration Cost has the meaning set forth in Section 5.06.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Cost of Capital Improvement Projects means the costs of acquiring, constructing, reconstructing, expanding, improving and engineering Capital Improvement Projects, and related financing costs.

  • Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period.

  • Collection Costs means an amount that the Municipality can charge with regard to the enforcement of a consumer’s monetary obligations;

  • Acquisition Cost means the cost to acquire a tangible capital asset including the purchase price of the asset and costs necessary to prepare the asset for use. Costs necessary to prepare the asset for use include the cost of placing the asset in location and bringing the asset to a condition necessary for normal or expected use.

  • Costs of the Project means Recipient’s actual costs (including any financing costs properly allocable to the Project) that are (a) reasonable, necessary and directly related to the Project, (b) permitted by generally accepted accounting principles to be Costs of the Project, and (c) are eligible or permitted uses of the Financing Proceeds under applicable state or federal statute and rule.

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • refurbishment means repairing of used electrical and electronic equipment as listed in Schedule I for extending its working life for its originally intended use and selling the same in the market or returning to owner;

  • Property Expenses means the costs (including, but not limited to, payroll, taxes, assessments, insurance, utilities, landscaping and other similar charges) of operating and maintaining any Eligible Property or Property which secures Other Recourse Debt that are the responsibility of the Borrower or the applicable Material Subsidiary that are not paid directly by any Tenant, but excluding depreciation, amortization, interest costs and maintenance capital expenditures.

  • Exploration Costs means costs incurred in identifying areas that may warrant examination and in examining specific areas that are considered to have prospects that may contain oil and gas reserves, including costs of drilling exploratory wells and exploratory type stratigraphic test wells. Exploration costs may be incurred both before acquiring the related property and after acquiring the property. Exploration costs, which include applicable operating costs of support equipment and facilities and other costs of exploration activities, are:

  • Controllable Operating Expenses means all Operating Expenses except real property taxes, all forms of insurance, utility expenses, costs of services provided under a union contract, payments under CC&R’s or to an owners’ association and costs associated with repairs due to casualty, vandalism or other source outside of Landlord’s reasonable control.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Cleanup costs means expenses (including but not limited to legal and professional fees) incurred in testing for, monitoring, cleaning up, removing, containing, treating, neutralizing, detoxifying or assessing the effects of Pollutants.