Right of Way Construction Permit definition

Right of Way Construction Permit or "ROW Construction Permit" shall mean an authorization to excavate in or obstruct Right of Way at a specific place and time, to install, operate and maintain Facilities within a specified portion of Right of Way.
Right of Way Construction Permit means a written permit to encroach in and upon public streets and utility easements as approved by the Director of the Public Works Department.

Examples of Right of Way Construction Permit in a sentence

  • The Design Check is to be performed with the City Public Works Department and Building Division’s Plan Check, and to be used as the basis for issuing a Grading Permit, Right of Way Construction Permit and Building Permit.

  • Please upload the Courtesy Review Permit document to the Right of Way Construction Permit application when applied for and other required documents.

  • When ready to proceed, the contractor assigned must reference back to the Courtesy Review permit number when submitting their Right of Way Construction Permit.

  • D) All hours worked by Sworn Members shall be paid in the following manner.

  • One immediate point to note is that the use of annual data 12Results using a one- and two-year lead are very similar, and are available from the authors upon request.

  • The Courtesy Review Permit and the Right of Way Construction Permit are required to be uploaded to the Small Cell Node permit application as an attachment with the other required documents.

Related to Right of Way Construction Permit

  • Construction permit is defined in Section 4.

  • Title V Permit means an operating permit under Title V of the Act.

  • General permit means a Permit which covers multiple dischargers of a point source category within a designated geographical area, in lieu of individual Permits being issued to each discharger.

  • Single event permit means a permit issued in accordance with Chapter 9, Part 3, Single Event Permit.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Occupation Permit means a temporary or permanent occupation permit issued by the Building Authority in relation to the Development or any part thereof;

  • Operating Permit means a permit issued pursuant to section 10 of this local law. The term “Operating Permit” shall also include an Operating Permit which is renewed, amended or extended pursuant to any provision of this local law.

  • WTO GPA country construction material means a construction material that—

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Title V operating permit means a permit issued under Chapter 3745-77 of the Administrative Code.

  • Parking Permit means a season ticket, contract permit, business permit, staff permit, disabled badge or resident’s permit of a type and design issued by the Council;

  • Building Permit means a permit for the construction of one or more Units, issued by the City, or other public agency in the event the City no longer issues said permits for the construction of Units within CFD No. 11. For purposes of this definition, "Building Permits" shall not include permits for construction or installation of commercial/industrial structures, parking structures, retaining walls, and utility improvements not intended for human habitation.

  • construction work permit means a document issued in terms of regulation 3; "contractor" means an employer who performs construction work;

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • WPDES permit means the Wisconsin pollutant dis- charge elimination system permit issued by the department under ch. 283, Stats., for the discharge of pollutants.

  • PAL permit means the construction permit issued by the Department that establishes a Plantwide Applicability Limitation (PAL) for a major stationary source.

  • Final permit means the version of a permit issued by the Department that has completed all review procedures required by Chapter 14, and for a Class I permit, Chapter 13.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Caribbean Basin country construction material means a construction material that—

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • NPDES Permit means any permit or equivalent document or requirements issued by the Administrator, or, where appropriated by the Director, after enactment of the Federal Clean Water Act to regulate the discharge of pollutants pursuant to Section 402 of the Federal Act.

  • Scheduled Construction Period means the period commencing from the Appointed Date and ending on Scheduled Completion Date;

  • Height of building means height measured from the abutting road and in case of undulated terrain height can be considered as average of the corresponding ground level. The parapet wall, staircase head room, lift room, water tank are excluded from the height of the building.

  • Planning Permission means any permission, consent or approval given under the Planning Acts;