Examples of Run of Mine in a sentence
Operation without the water sprays can only take place when the Run of Mine (ROM) coal entering the plant hassufficient moisture content not to create emissions in excess of the requirements in 123.1 and 123.2. When the watersprays are incapable of operating, operators of the plant shall perform the observations described in Condition #011 of this Section, at least twice per day, to ensure that the emissions are not in excess of these requirements.
Removal of top soils, overburden and inter-burden to produce Run of Mine (ROM) coal.
Commencing the operations of the Mines and the CHPP to process Run of Mine (ROM) coal and delivering Coking and Thermal coal to ICVL Zambeze, Lda at the specified point of delivery (the participant must include in its proposal one or both options: delivery directly to the port of Beira (or any other feasible alternative sea-port arranged by bidder) and/or to the Benga CHPP stock yard.
Run of Mine Mineral Resources have an effective date of November 30, 2017 and are reported within the pit designs at a 0.01 opt gold cut-off grade.
Run of Mine Mineral Reserves are effective as of November 30, 2017.
United Wambo has approval to extract up to 10 million tonnes per annum (mtpa) of Run of Mine (ROM) coal from the combined Wambo Open Cut (Wambo Pit) and United Open Cut (United Pit).
Changes in Iron Ore Reserve Estimates: 2011 versus 2010 WorldReginfo - 90b47fa3-ce9e-4f23-967d-abe3c78c65eeOur iron ore reserve estimates have decreased between December 31, 2010 and 2011 by 416 million metric tonnes of Run of Mine.
A cut-off grade of 0.9 g/t Au was applied for the Run of Mine (ROM) high grade and a 0.5 g/t – 0.9 g/t cut-off used for the low grade stocks.
Levine, 555 U.S. 555, 565 (2009); see supra Part II.A.1–2, describing express preemption.) In any event, Kroger easily overcomes any such presumption.
For the purpose of calculating remittances, the Amended Renard Streaming Agreement will apply separately to Run of Mine (“ROM”) diamonds sold at tender, and any diamonds smaller than the +7 DTC sieve size that are recovered in excess of agreed upon proportions within a run of mine diamond sale.