Examples of Sampling Manhole in a sentence
The District also reserves the right to apply said Action Level to the Discharge in the next Sanitary Sewer manhole downstream of the facility in the event that there is neither a GI sampling location nor a Sampling Manhole at the site.
Any building that will accommodate a food service or food preparation tenant requires an Outside Grease Trap Tank and an MMSD Sampling Manhole designed and installed to the City Developer’s Handbook Requirements.
Sampling Manhole - Dischargers of non-domestic wastes may be required to install a sampling manhole at the location where the lateral sewer connects to the sewer main as designated by the Agency.
The District reserves the right to apply said Local Limits at an end-of- process Discharge location that connects to the Public Sewer system in the event that a unique Sampling Manhole at end-of-pipe is not available.
In the event that a suitable Sampling Manhole does not exist as per the District’s applicable sewer use ordinance and no end-of-process Discharge location exists, the “sampling facility” shall be considered to be the nearest downstream manhole in the Public Sewer to the point at which the Building Sewer is connected.
Sanitary Sampling Manhole – The owner agrees for all non-residential uses, to install a sanitary sampling manhole accessible at the property line of the subject lands to the City Engineer at all times.
The temperature monitoring data informed DESand EPA that the NCCW discharge had the potential to exceed the 83°F GP limit at the effluent monitoring point.As reported, the DMR data and field data collection efforts of August 21, 2012, confirmed that the temperature of the NCCW discharge water at the discharge monitoring location (Sampling Manhole DMH-6) periodically exceeded 83.0°F, the protective maximum temperature for a warm water fishery identified by NHDES and NHFGD.
If required, the Sampling Manhole shall be constructed in accordance with Sonoma County Water Agency Design and Construction Standards for Sanitation Facilities, and shall be constructed under a separate permit issued by the Engineering Division of PRMD.
The Study is required to be finalized to the satisfaction of the City Engineer prior to the issuance of construction permits.Sanitary Sampling Manhole – The owner agrees for all non-residential uses, to install a sanitary sampling manhole accessible at the property line of the subject lands to the City Engineer at all times.
The Survey evaluation must be completed by the Sonoma County Water Agency and submitted to the PRMD Engineering Division before a building permit for the project can be approved.b. If additional sewer pre-treatment and/or monitoring facilities (i.e. Grease trap, Sampling Manhole, etc.) are required by the Sonoma Valley County Sanitation District per the Wastewater Discharge Survey, the Applicant shall comply with the terms and requirements of the Survey prior to commencing any food or beverage service.