Satmex 5 definition

Satmex 5 means the BSS601 HP (Boeing Satellite Systems) known as Satmex 5 on which Holdings or its Restricted Subsidiaries have a right to use transponders.
Satmex 5. Satmex’s telecommunications satellite known as Satmex 5.

Examples of Satmex 5 in a sentence

  • In 1999, the operators Satmex, from Mexico, and Telesat, from Canada, reached an agreement to create capacity for the new Satmex 5 network, which became operational in January 1999.

  • This position is occupied by third-generation satellite network Satmex 5, which is scheduled for replacement by satellite Satmex 8.

  • It is necessary to identify a subset of effective variables, which were defined as the nucleus [17].One method of automatic generation of the nucleus is the automatic classification of variables by means of the algorithm of objective cluster analysis, described in [20,22].

  • Satmex 8” means the satellite to be constructed to replace theexisting Satmex 5 satellite, pursuant to the contract entered into on May 7, 2010 and effective as of April 1, 2010 between Satmex and Space Systems/Loral, Inc., a Delaware corporation.

  • Satmex 5, Satmex 6 and Satmex 8 are satellites licensed by Mexico.

  • Strategic Drivers 2009 Satellite Occupation by Band As of March 31, 2009 Notes: It is included just the capacity available for sale (State Reserve, Loral Usufructo and Satmex Own Use are not considered) (1) Capacity Optimization Satmex 5 Satmex 6 Ku-Band C-Band +13.16% +1.96% +6.51% +38.61% +2.54% +7.11% -0.97% +9.01% Q1-2008 Utilization Q1-2009 Utilization Var Q1-09 vs Q1-08 (1) 4.

  • Satmex 5 is currently in-orbit and operational at 114.9°W, Satmex 6 is in-orbit and operational at 113°W.L. and Satmex 8 is in orbit and operational at 116.8°W.

  • Satmex 5 has been coordinated with the applicable governing bodies of the United States, Canada and all other relevant jurisdictions and administrations for the provision of the Space Segment Capacity in accordance with this Agreement, except to the extent that the Regulatory Approval is necessary to accommodate CUSTOMER's particular intended use of the Space Segment Capacity.

  • CUSTOMER declares that it shall comply with the applicable legislation in the countries within the region(s) where it shall utilize the Satmex 5 satellite service, and that it shall obtain the necessary authorization(s) from the corresponding regulating institutions to install, operate or exploit the transmitting and/or receiving ground station(s) prior to doing so.

  • Strategic Drivers 2009 Satellite Occupation by Band As of June 30, 2009 Notes: It is included just the capacity available for sale (State Reserve, Loral Usufructo and Satmex Own Use are not considered) (1) Capacity Optimization (Strong funnel is available) Satmex 5 Satmex 6 Ku-Band C-Band +5.95% +5.30% +38.51% +1.42% +6.11% -0.45% +5.87% H1-2008 Utilization H1-2009 Utilization Var H1-09 vs H1-08 (1) -2.26% (1) 4.

Related to Satmex 5

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Spacecraft (7 9) means active and passive satellites and space probes.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Technical Support means the technical assistance for attempting resolution of a reported Case through error correction, patches, hot fixes, workarounds, replacement deliveries, or any other type of Product corrections or modifications.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Technical Support Services means the technical support and maintenance Services provided by us according to our then-current technical support policy and procedure listed at xxxxxxxxxxxxx.xxx (“Technical Support Policy”) when the Services are purchased.

  • Runtime Product means the version specific files and application program interfaces (APIs) specified in the RUNTIME.TXT file provided with SAP Crystal Reports 2008, SAP Crystal Reports for Eclipse 2.0, and SAP Crystal Reports for Visual Studio 2010.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Sewage Treatment Plant means any arrangement of devices and structures used for treating sewage.

  • commercial air transport means an aircraft operation involving the transport of passengers, cargo, or mail for remuneration or hire.

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • Network Interface Device or "NID" is a Network Element (including all of its features, functions and capabilities) that includes any means of Interconnection of End User Customer premises wiring to Qwest's distribution plant, such as a cross connect device used for that purpose. "New Service Provider" means the Party to which an End User Customer switches its local Exchange Service or the Party to which an End User Customer is porting its telephone number(s).

  • The Specification means the Specification annexed to or issued with G.T.C.C. and shall include the schedules & drawings attached thereto as well as all samples and pattern, if any.

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • Technical safeguards means the technology and the policy and procedures for its use that 27 protect electronic PHI and control access to it.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).