Examples of Secondary Schedule in a sentence
They may also be updated/revised at the Secondary Schedule Change Date each year.
Metrolinx will provide at least 12 months’ notice before changing the Primary Schedule Change Date and/or the Secondary Schedule Change Date.
This is reinforced in Secondary Schedule Map 1a (Meaford), which places the subject lands in the same “Primary Settlement Area” land use type.
That Section 2.6.3 (10) is hereby deleted and replaced with the following: Lands identified as Future Secondary Plan Area on Schedule A – Map 3 and Secondary Schedule Map 3j and described Part Lots 8, 9, 10 and 11, Concession 1 South of the Durham Road (SDR), Geographic Township of Bentinck, Municipality of West Grey shall be utilized primarily for uses existing as of the date of adoption of Official Plan Amendment No. 80 to the County of Grey Official Plan (March 3, 2009).
That policy area has been identified with cross-hatching on the amended Schedule A - Map 3 and amended Secondary Schedule Map 3j, and referenced on both schedules with the words “Future Secondary Plan Area See Section 2.6.3(10)”.
PMOC notes that satisfaction of this requirement may not be consistent with maintaining the project budget. Secondary Schedule Mitigation (critical path compression)o ELPEP Requirement: 125 CD Current Forecast: Schedule mitigation efforts are under review.
Nonetheless, for clinicians struggling with the use of drugs with a low therapeutic index, in a high intensity situation, the model will help in clinical decision making.
Final Title Vesting occurred on October 25, 2011.▪ Minimum Allowable Secondary Float Patho ELPEP Requirement: 25 Calendar Dayso Current Forecast: 107 CD (75 WD) through construction and fit-out of the 96th Street Station▪ Secondary Schedule Mitigation (critical path compression)o ELPEP Requirement: 125 CDo Current Forecast: Several opportunities are under consideration by the SAS Project Team that will improve the schedule primary and/or secondary paths.
Notwithstanding the land use designations shown on Secondary Schedule Map 3p and the resulting opportunities, those land uses, buildings and structures legally existing on the date of adoption of this Secondary Plan may continue to be used for such purposes.
The lands within the boundary of the Secondary Plan are designated either ‘Highway Commercial’ or ‘Open Space’ on Secondary Schedule Map 3p.Alterations to the internal boundaries between these land use designations will require an amendment to the County of Grey Official Plan, except were such alteration represents a minor adjustment.