Combined sewer overflow means the discharge of untreated or
Total tetrahydrocannabinol means the same as that term is defined in § 3.2-4112.
Production, Use or Storage of Nuclear Material means the production, manufacture, enrichment, conditioning, processing, reprocessing, use, storage, handling and disposal of Nuclear Material.
Critical infrastructure means existing and proposed systems and assets, whether physical or virtual, the incapacity or destruction of which would negatively affect security, economic security, public health or safety, or any combination of those matters.++
Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per million.
Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Hydraulic fracturing means the fracturing of underground rock formations, including shale and non-shale formations, by manmade fluid-driven techniques for the purpose of stimulating oil, natural gas, or other subsurface hydrocarbon production.
Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:
Field emission equipment means equipment which uses an x-ray tube in which electron emission from the cathode is due solely to the action of an electric field.
Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.
Electrical Fitter means an employee who is mainly employed in the workshops manufacturing, fitting, and repairing electrical instruments, machines, and apparatus. Electrical fitting in this definition shall include armature and transformer winding, and people solely engaged in making and repairing instruments. The legitimate possession of a certificate of competency in this particular class of work issued by the Electrical Licensing Board under the Electricity Act 1994 shall be recognised as proof of efficiency.
Subloop shall have the meaning set forth in Section 9.3.1.
Improvement Fund means the Improvement Fund for General Obligation Temporary Notes, Series 2017-1 created pursuant to Section 501 hereof.
Assets Under Development means any real property under construction (excluding any completed Property under minor renovation) until such property has received a certificate of occupancy.
Small Diversity business concern means a small business concern that is at least fifty-one (51) percent unconditionally owned by one or more individuals who are both socially and economically diverse, or a publicly owned business that has at least fifty-one (51) percent of its stock unconditionally owned by one or more socially and economically diverse individuals and that has its management and daily business controlled by one or more such individuals. This term also means a small business concern that is at least fifty-one (51) percent unconditionally owned by an economically diverse Indian tribe or Native Hawaiian Organization, or a publicly owned business that has at least fifty-one (51) percent of its stock unconditionally owned by one of these entities, that has its management and daily business controlled by members of an economically diverse Indian tribe or Native Hawaiian organization.
Very high radiation area means an area, accessible to individuals, in which radiation levels from radiation sources external to the body could result in an individual receiving an absorbed dose in excess of 5 Gy (500 rad) in one hour at one meter from a source of radiation or one meter from any surface that the radiation penetrates.
Best available control technology (BACT means an emissions limitation (including a visible emission standard) based on the maximum degree of reduction for each pollutant subject to regulation under CAA which would be emitted from any proposed major stationary source or major modification which the Department, on a case-by-case basis, takes into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 7 DE Admin. Code 1120 and 1121. If the Department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results.
Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:
Combined Sewer means a sewer receiving both surface runoff and sewage.
Total Assets under Management is the total average assets under management for the month for all Accounts or portions thereof for which all investment advisers (including the Adviser) to which FASC provides that Category of Services act as investment adviser or subadviser and which utilize the Category of Services. “Applicable Margin” is 0.10.
The Works/Project means the works to be executed or done under this contract.
total system means the transmission system and the distribution system of the Board taken together;
Radiation therapy simulation system means a radiographic or fluoroscopic x-ray system intended for localizing the volume to be exposed during radiation therapy and confirming the position and size of the therapeutic irradiation field.
Hydraulic conductivity means the quantity of water that will flow through a unit cross-sectional area of a porous material per unit of time under a hydraulic gradient of 1.0;
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Fluoroscopic imaging assembly means a subsystem in which X-ray photons produce a visual image. It includes the image receptor(s) such as the image intensifier and spot-film device, electrical interlocks, if any, and structural material providing linkage between the image receptor and diagnostic source assembly.