Area Plan or “multiyear area plan” means a document, developed in accordance with the uniform area plan format and IAPI issued by the department, that is submitted to the department every four years, with annual updates, by an AAA in order to receive subgrants from the department’s grants.
Project area plan means a written plan that, after its effective date, guides and controls the development within a project area.
Area A means the area marked “Area A” outlined in red on the Plan (excluding that part shaded grey on the Plan);
Basal area means the effective surface area available to transmit the treated effluent from the filter media in a mound system into the in-situ receiving soils. The perimeter is measured at the interface of the imported fill material and in-situ soil. On sloping sites, only the area down-gradient from the up-slope edge of the distribution media may be included in this calculation.
Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);
Site Plan means a document or map that may be required by a county during a preliminary review preceding the issuance of a building permit to demonstrate that an owner's or developer's proposed development activity meets a land use requirement.
Natural area means an area of the rural or non-urban environment which is in an unspoilt natural state or is of high scenic value, and includes, but is not limited to, national parks, game reserves, nature reserves, marine reserves, wilderness areas, areas of extensive agriculture and scenic areas.
site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;
ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;
Redevelopment Plan means the “Lincoln Center Redevelopment Plan” passed, adopted and approved by the City pursuant to the Resolution, and shall include any amendment of said Redevelopment Plan heretofore or hereafter made by the City pursuant to law.
Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Development Area means that area to which a development plan is applicable.
Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;
Planning area means a planning area or a development area or a local planning area or a regional development plan area, by whatever name called, or any other area specified as such by the appropriate Government or any competent authority and includes any area designated by the appropriate Government or the competent authority to be a planning area for future planned development, under the law relating to Town and Country Planning for the time being in force and as revised from time to time;
Technology Transfer Plan has the meaning set forth in Section 4.1.5.
Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Urban renewal area means a slum area or a blighted area or a combination thereof which the municipality designates as appropriate for an urban renewal project.
Cluster development means a contiguous cluster or
Energy efficiency improvement means equipment, devices, or materials intended to decrease energy consumption, including, but not limited to, all of the following:
Area B means the area marked “Area B” outlined in orange on the Plan;
Specified anatomical areas means and includes:
Area source means any stationary source of hazardous air pollutants that is not a major source as defined in rule 567—22.100(455B).
Tight-fitting facepiece means a respiratory inlet covering that forms a complete seal with the face.
Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.