Examples of Storage Building in a sentence
The room is to be used for the storage of automotive equipment and supplies, office supplies, forms, publication storage, and storage of assorted bulk items, i.e. road flares.Section D-5; Exterior Storage Building will be used to store items that are not affected by temperature and humidity changes such as tires and other equipment.
F.O.B.Where the bid form does not call for a separate unit cost for the chemicals and transportation, all prices shall be F.O.B. the Water Treatment Plant Maintenance Storage Building, 602 South Free King Highway, Pittsburg, Kansas 66762.
Orr and Son for the Equipment Storage Building Project at the Centre County Public Safety Training Center.
Low-Hazard Storage) Building used for storage of noncombustible material such as products on wood pallets or in paper cartons with or without single thickness divisions or in paper wrappings.
Truck Dump, FGD Storage Building, FGD Conveyors from NIPSCO, Waste (Reclaim) Bin Infeed Conveyor, FGD Bin Discharge Belt Conveyor, Reclaim Bin Discharge Belt Conveyors, ALLU, Cleanout ConveyorFugitive Dust Control Measures: The high moisture content of the incoming raw FGD effectively minimizes emissions from these units.
The Refinery Company will allow the Fertilizer Company to occupy a portion of the buildings known on the date hereof as the “South Administration Building,” the “Laboratory Building,” and the Oil Storage Building for, without limitation, purposes of office space, maintenance space, storage and laboratory space therein, as more specifically provided in the Lease Agreement.
Tiziana Bonapace, Director ICT and Disaster Risk Reduction Division (IDD) provided overall direction.
Waterfront Maine LP (Cumberland Cold Storage Building) on Commercial Street (Economic Development TIF) Duration: 20-year term (FY12 through FY31)Percentage: 63% years 1 through 5; 64% years 6 through 10; 55% years 7 through15; 45% years 16 and 17; 40% years 18 and 19; and, 35% year 20 – with a maximum cumulative TIF payment numeric cap not to exceed $2,870,058.
Included in the cost is an expansion of the Public Works Garage, a Cold Storage Building and the acquisition of various fleet assets (including half tons, a loader, bucket truck/trailer and sidewalk plows).
These modifications may include installation of a high level alarm and backflow prevention measures in Fuel Storage Building (“FSB”) Sump 28, sealing and coating of the FSB Truck Bay subfloor, and sealing or replacing designated building/structural joints that provide potential paths to groundwater.