Stormwater quantity control definition

Stormwater quantity control means the control of the rate and volume of stormwater released from a development site, and includes any attenuation, detention and retention facility;
Stormwater quantity control means the control of the rate and/or volume of stormwater released from a development site.
Stormwater quantity control means the control of the rate and volume of stormwater released from a development site, and includes any attenuation, detention and retention Comment [JC13]: Proposed new definition from the City of JHB Stormwater Management By-Lawfacility;Comment [JC14]: Proposed new definition from the City of JHB Stormwater Management By-Law‘‘stormwater system’’ means both the constructed and natural facilities, including pipes, culverts and watercourses, whether over or under public or privately owned land, used or required for the management, collection, conveyance, temporary storage, control, monitoring, treatment, use and disposal of stormwater.‘‘water pollution incident’’ means an incident or occurrence whereby a substance or matter, other than stormwater, is discharged directly or indirectly into the stormwater system and which may be a danger to health or may adversely affect the general quality of water in the stormwater system to such an extent that public health or the health of natural ecosystems may be threatened; and‘‘watercourse’’ bears the meaning assigned to it in the National Water Act, 1998 (Act 36 of 1998).

Examples of Stormwater quantity control in a sentence

  • Stormwater quantity control will be provided by the City of Redmond upon payment of the Downtown Capital Facility Charge.ii.

  • Stormwater quantity control, quality treatment, and erosion and sedimentation control, as required for the development, shall be designed in accordance with Kitsap County Code Title 12 effective at the time this permit application was deemed fully complete.

  • Stormwater quantity control, quality treatment, and erosion and sedimentation control shall be designed in accordance with Kitsap County Code Title 12 effective at the time the Conditional Use Permit application was deemed complete, March 7, 2018.

  • Stormwater quantity control, quality treatment, and erosion and sedimentation control shall be designed in accordance with Kitsap County Code Title 12 effective at the time the Conditional Use Permit Major Revision application was deemed complete, August 28, 2019.

  • Stormwater quantity control, quality treatment, and erosion and sedimentation control, as required for the lot development, shall be designed in accordance with Kitsap County Code Title 12 effective at the time the Preliminary Short Subdivision application was deemed complete, April 8, 2020.

  • Stormwater quantity control, quality treatment, and erosion and sedimentation control, as required for the lot development, shall be designed in accordance with Kitsap County Code Title 12 effective at the time the Preliminary Large Lot Subdivision application was deemed complete, October 8, 2020.

  • These parameters may be required to be revised for the final design to meet all requirements of Kitsap County Code Titles 11 and 12.3. Stormwater quantity control, quality treatment, and erosion and sedimentation control, as required for the lot development, shall be designed in accordance with Kitsap County Code Title 12 effective at the time the Preliminary Large Lot Subdivision application was deemed complete, July 20, 2021.

  • In order to properly determine the Stormwater quantity control measures necessary for a given Site, runoff rates shall be computed for the area of the parcel under Development plus the area of the Watershed flowing into the parcel under Development.

  • Stormwater quantity control, quality treatment, and erosion and sedimentation control shall be designed in accordance with Kitsap County Code Title 12 effective at the time this permit application was deemed fully complete.

  • Stormwater quantity control, quality treatment, and erosion and sedimentation control shall be designed in accordance with Kitsap County Code Title 12 effective at the time the Preliminary Subdivision application was deemed complete (June 10, 2014).


More Definitions of Stormwater quantity control

Stormwater quantity control means the control of the rate and/or volume of stormwater released from a development site. Stormwater quantity control facilities include, but are not limited to, detention and retention facilities.

Related to Stormwater quantity control

  • Water quality means the physical characteristics of water within shoreline jurisdiction, including water quantity, hydrological, physical, chemical, aesthetic, recreation-related, and biological characteristics. Where used in this chapter, the term "water quantity" refers only to development and uses regulated under this chapter and affecting water quantity, such as impermeable surfaces and storm water handling practices. Water quantity, for purposes of this chapter, does not mean the withdrawal of ground water or diversion of surface water pursuant to RCW 90.03.250 through 90.03.340.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Water quality volume means the volume equal to the first one-half inch of runoff multiplied by the impervious surface of the land development project.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Quality control means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Stormwater means water resulting from precipitation (including rain and snow) that runs off the land’s surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.

  • National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Stormwater management system means any equipment, plants,

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Sewage sludge weight means the weight of sewage sludge, in dry U.S. tons, including admixtures such as liming materials or bulking agents. Monitoring frequencies for sewage sludge parameters are based on the reported sludge weight generated in a calendar year (use the most recent calendar year data when the NPDES permit is up for renewal).