Substation Modifications definition

Substation Modifications means the construction and modification of Substation facilities provided in Section 3.04(a)(i).

Examples of Substation Modifications in a sentence

  • Accordingly, if this Agreement is terminated prior to the completion of the Substation Modifications and the Attachment Facilities for any reason referenced in Section 5.01(b) (“Construction Period Termination”), Con Edison shall have the right, but not the obligation to terminate any Supplier/Contractor Contracts that it executed in connection with the Substation Modifications or the installation and connection of the Generator Assets in the Substation.

  • Because of those Supplier/Contractor Contracts and the nature of the Substation Modifications, Con Edison will have only limited ability to terminate the construction of the Substation Modifications and installation of the Attachment Facilities once such work has commenced.

  • As provided in the Master Agreement, Generator shall reimburse Con Edison for the cost (including overhead costs) of operating and maintaining the Substation equipment installed in conjunction with the Substation Modifications.

  • However, to the extent that Generator’s payments for System Upgrade Facilities and Substation Modifications under this Agreement qualify as having created “Headroom” under Attachment S to the ISO OATT, Generator (not Con Edison) shall be entitled to the benefits associated with such Headroom under the ISO OATT.

  • However, that estimate shall not diminish, change, or affect Generator’s obligation to pay to Con Edison all costs that Con Edison actually incurs, including those that exceed such estimate, in connection with the Substation Modifications and the installation and connection of Generator Assets in the Substation.

  • In respect of the construction of the Substation Modifications and of all subsequent construction work, modifications or circuit changes involving new or existing facilities, equipment, systems or circuits that could reasonably be expected to affect the operations of the Generating Facilities, Con Edison shall provide Generator with drawings, plans, specifications and other relevant documentation for review during the design phase of such work.

  • A description of the Substation Modifications is set forth on Schedule 3.04(a)(i) of this Agreement.

  • Generator shall, at its own expense, have the right to inspect or observe Con Edison's testing, calibration and maintenance and similar activities in respect of, and installation, construction or other modifications to, Protective Relaying Systems, Revenue Meter Systems, Substation Interface Cables owned by Con Edison, and Substation Modifications in order to verify the adequate protection and safe operation thereof.

  • Generator waives all claims against Con Edison relating to any Indemnifiable Losses caused by any delay in the completion of the Substation Modifications or installation of the Generator Assets within the Substation, except where such delay results from Con Edison’s failure to use reasonable efforts to complete the modifications or installation promptly.

  • Trench installation would total approximately 1,000 linear feet from the cable pole to the substation terminal equipment.• Existing Substation Modifications: Installation of a new 69-kV power line position at the Existing Substation to connect to TL 6965.

Related to Substation Modifications

  • Investment Strategy Modification means with respect to an Investment Strategy, the Portfolio Administrator makes operational adjustments to the Investment Strategy to ensure that, so far as possible, the basic principles and economic effect of the Investment Strategy are maintained or any material modification to the Investment Strategy or its implementation by the Portfolio Administrator.

  • Substantial modification means modification of a relevant source that results in a significant increase in emissions, excluding any change in emissions resulting from by-product recovery. It shall be a matter for the Party to decide whether a modification is substantial or not;

  • Material Modification means any modification to an Interconnection Request that has a material adverse effect on the cost or timing of Interconnection Studies related to, or any Network Upgrades or Local Upgrades needed to accommodate, any Interconnection Request with a later Queue Position.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;