Subsurface utility engineering notification definition

Subsurface utility engineering notification means a notice to the notification association that a project is being designed by a licensed professional engineer and that the project will include the investigation and depiction of existing underground facilities that meet or exceed the ASCE 38 standard.
Subsurface utility engineering notification means a notice to the Notification Association that a project is being designed by a licensed professional engineer and that the project will include the investigation and depiction of existing underground facilities that meet or exceed the ASCE 38 Standard.

Related to Subsurface utility engineering notification

  • Subsurface tracer study means the release of a substance tagged with radioactive material for the purpose of tracing the movement or position of the tagged substance in the well-bore or adjacent formation.

  • Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.

  • Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;

  • Environmental Consultant has the meaning set forth in Section 5.17(a).

  • Environmental Assessment means an assessment of the presence, storage or release of any hazardous or toxic substance, pollutant or contaminant with respect to the collateral securing a Shared-Loss Loan that has been fully or partially charged off.

  • Surface waters means all waters of the state as defined in G.S. 143-212 except underground waters

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Initial Environmental Examination or “IEE” means the initial environmental examination for the Project, including any update thereto, prepared and submitted by the Borrower and cleared by ADB;

  • Surface water means all water which is open to the atmosphere and subject to surface runoff.

  • Project Engineer means the surveyor or engineer employed by or private

  • Surveys has the meaning set forth in Section 4(o) above.

  • Architect/Engineer or “A/E” means the Person identified in the Agreement responsible for providing professional design services and construction contract administration for the Project. The A/E shall be (1) a registered architect holding a license and certificate of authorization issued by the Ohio Architects Board pursuant to ORC Chapter 4703, (2) a landscape architect holding a license and certificate of authorization issued by the Ohio Landscape Architects Board pursuant to ORC Chapter 4703, or (3) a professional engineer or professional surveyor holding a license and certificate of authorization issued by the Ohio Engineers and Surveyors Board pursuant to ORC Chapter 4733. As used in the Agreement, the term A/E may include a criteria architect or engineer for a Design-Build project.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Engineering means the application of scientific knowledge for the design, control, or use of building structures, equipment, or apparatus.