Flood Boundary and Floodway Map (FBFM means an official map of a community, issued by the FEMA, on which the Special Flood Hazard Areas and the floodways are delineated. This official map is a supplement to and shall be used in conjunction with the Flood Insurance Rate Map (FIRM).
Environmental Reports means each and every “Phase I Environmental Site Assessment” (and, if applicable, “Phase II Environment Site Assessment”) as referred to in the ASTM Standards on Environmental Site Assessments for Commercial Real Estate, E 1527-2000 and an asbestos survey, with respect to each Mortgaged Property, prepared by one or more Environmental Auditors and delivered to Lender and any amendments or supplements thereto delivered to Lender.
Best available techniques means the most effective and advanced stage in the development of activities and their methods of operation which indicate the practical suitability of particular techniques for providing in principle the basis for emission limit values designed to prevent and, where that is not practicable, generally to reduce emissions and the impact on the environment as a whole.
Floodway fringe means an area that is outside a floodway and is
Assisted cleaning or washing of tangible personal property means cleaning or washing of tangible personal property if the cleaning or washing labor is primarily performed by an individual:
Engineering Reports has the meaning assigned such term in Section 2.07(c)(i).
Current significant investigative information means investigative information that a licensing board, after an inquiry or investigation that includes notification and an opportunity for the audiologist or speech-language pathologist to respond, if required by state law, has reason to believe is not groundless and, if proved true, would indicate more than a minor infraction.
Environmental Information Regulations means the Environmental Information Regulations 2004 and any guidance and/or codes of practice issued by the Information Commissioner or relevant government department in relation to such regulations.
Good Engineering Practice means, Works carried out in accordance with the following standards/ specifications,
Initial Engineering Report means the engineering report concerning Oil and Gas Properties of Loan Parties dated as of June 30, 2006 prepared by Netherland, Xxxxxx & Associates and XxXxxxxx & XxxXxxxxxxx.
Generally applicable environmental radiation standards means standards issued by the U.S. Environmental Protection Agency (EPA) under the authority of the Atomic Energy Act of 1954, as amended, that impose limits on radiation exposures or levels, or concentrations or quantities of radioactive material, in the general environment outside the boundaries of locations under the control of persons possessing or using radioactive material.
Building Contract means a contract entered under Transportation Code, Chapter 223, Subchapter A for the construction or maintenance of a Department building or appurtenant facilities and considered to be a Highway Improvement Contract as defined in Texas Administrative Code, § 9.11.
Environmental Report The environmental audit report or reports with respect to each Mortgaged Property delivered to the related Mortgage Loan Seller in connection with the origination or acquisition of the related Mortgage Loan.
Environmental Assessment means an assessment of the presence, storage or release of any hazardous or toxic substance, pollutant or contaminant with respect to the collateral securing a Shared-Loss Loan that has been fully or partially charged off.
Environmental information means any information in written, visual, aural, electronic or any other material form on:
Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.
Urban growth areas means those areas designated
Functional behavioral assessment means an individualized assessment of the student that results in a team hypothesis about the function of a student’s behavior and, as appropriate, recommendations for a behavior intervention plan.
Best available technology means those practices which most appropriately remove, treat, or isolate contaminants from groundwater, soil or associated environment, as determined through professional judgment considering actual equipment or techniques currently in use, published technical articles, site hydrogeology and research results, engineering and groundwater professional reference materials, consultation with experts in the field, capital and operating costs, and guidelines or rules of other regulatory agencies.
Potential geologic hazard area means an area that:
Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.
Engineering Report means either an Independent Engineering Report or an Internal Engineering Report.
Building Contractor means the building contractor or developer appointed or to be appointed by the Grant Recipient in respect of a Firm Scheme; Business Day means any day other than a Saturday, Sunday or a statutory Bank Holiday in England;
Company Financial Information As defined in Section 2(a)(ii).
environmental statement means the document certified as the environmental statement by the Secretary of State for the purposes of this Order;
Development Charges or “DC” shall mean the amount charged by the Company from the Applicant(s) towards carrying out the developmental works inside or around the Project, including but not limited to the payment of the following: