Surface water supply project definition

Surface water supply project means a project that withdraws or diverts water from a surface water body for consumptive or nonconsumptive purposes thereby altering the hydrologic regime of the surface water body. Projects that do not alter the hydrologic regime or that alter the hydrologic regime but whose sole purpose is flood control or storm water management are not included in this definition.
Surface water supply project means a project that withdraws or diverts water from a

Related to Surface water supply project

  • Water Supply Any problem with water supply? Yes No Unknown Comments: Home water treatment system: Yes No Unknown Comments: Fire sprinkler system: Yes No Unknown Does Not Apply Comments: Are the systems in operating condition? Yes No Unknown Comments:

  • Water supply system means a water distribution system, piping, connection fittings, valves and appurtenances within a building, structure, or premises. Water supply systems are also referred to commonly as premise plumbing systems.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • licensed water supplier means a company which is the holder for the time being of a water supply licence under Section 17A(1) of the 1991 Act(f);

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Surface water means all water which is open to the atmosphere and subject to surface runoff.

  • Auxiliary Water Supply means any water supply on or available to the premises other than the water purveyor's approved public water supply such as, but not limited to, a private well, pond or river.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.

  • Ground water means water below the land surface in a zone of saturation.

  • water supplier means the company supplying water in the water supply zone, whether a water undertaker or licensed water supplier;

  • Surface waters means all waters of the state as defined in G.S. 143-212 except underground waters

  • Generator Operator means the Person that Operates the Generating Facility and performs the functions of supplying electric energy and interconnected operations services within the meaning of the NERC Reliability Standards.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan; and

  • Gathering System means that portion of Gatherer’s pipeline system, including all appurtenances thereto, related to the provision of gathering and transportation services provided by Gatherer pursuant to this tariff.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)