Sustainability Metric 2019 Baseline definition

Sustainability Metric 2019 Baseline means the Borrower’s combined Scope 1, Scope 2 and Scope 3 greenhouse gas emissions on a per square foot basis for the fiscal year of the Borrower ended December 31, 2019, which amount shall be certified by the Parent in the duly executed Sustainability Metric Annual Certificate delivered by the Borrower to the Administrative Agent on the Second Amendment Effective Date.

Related to Sustainability Metric 2019 Baseline

  • Baseline means the “Initial Small Business Lending Baseline” set forth on the Initial Supplemental Report (as defined in the Definitive Agreement), subject to adjustment pursuant to Section 3(a).

  • Sustainability means the use, development, and protection of resources at a rate and in a manner that enables people to meet their current needs while allowing future generations to meet their own needs; “sustainability” requires simultaneously meeting environmental, economic and community needs.

  • Sustainability Factors means environmental, social and employee matters, respect for human rights, anti‐corruption and anti‐bribery matters.

  • Sustainability Report the annual non-financial disclosure report prepared in accordance with the Standard for Sustainability Reporting publicly reported by the Borrowers and published on an Internet or intranet website to which each Bank and the Administrative Agent have been granted access free of charge (or at the expense of the Borrowers).

  • Sustainability Structuring Agent means PNC Capital Markets LLC.

  • Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.

  • Environmental and Social Management Framework or “ESMF” means the framework included in the EA setting out modalities to be followed in assessing the potential adverse environmental and social impact associated with activities to be implemented under the Project, and the measures to be taken to offset, reduce, or mitigate such adverse impact.

  • Sustainability Risk means an environmental, social or governance event or condition that, if it occurs, could cause an actual or a potential material negative impact on the value of the investment;

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Interconnected Reliability Operating Limit or “IROL” shall mean the value (such as MW, MVAR, Amperes, Frequency, or Volts) derived from, or a subset of, the System Operating Limits, which if exceeded, could expose a widespread area of the bulk electrical system to instability, uncontrolled separation(s) or cascading outages.

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Vehicle measuring attitude means the position of the vehicle as defined by the co-ordinates of fiducial marks in the three-dimensional reference system.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Baseline area means any intra- state area (and every part thereof) des- ignated as attainment or unclassifiable under section 107(d)(1)(A)(ii) or (iii) of the Act in which the major source or major modification establishing the minor source baseline date would con- struct or would have an air quality im- pact for the pollutant for which the baseline date is established, as follows: equal to or greater than 1 μg/m3 (an- nual average) for SO2, NO2, or PM10; or equal or greater than 0.3 μg/m3 (annual average) for PM2.5.(ii) Area redesignations under section 107(d)(1)(A)(ii) or (iii) of the Act cannot intersect or be smaller than the area of impact of any major stationary source or major modification which:

  • State Level Monitoring Cell means the body constituted by the State Government for the control and elimination of ragging in institutions within the jurisdiction of the State, established under a State Law or on the advice of the Central Government, as the case may be.

  • Working level month (WLM) means an exposure to 1 working level for 170 hours (2,000 working hours per year divided by 12 months per year is approximately equal to 170 hours per month).

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Treatability study means a study in which a hazardous waste is subjected to a treatment process to determine: (1) Whether the waste is amenable to the treatment process, (2) what pretreatment (if any) is required, (3) the optimal process conditions needed to achieve the desired treatment, (4) the efficiency of a treatment process for a specific waste or wastes, or (5) the characteristics and volumes of residuals from a particular treatment process. Also included in this definition for the purpose of the § 261.4 (e) and (f) exemptions are liner compatibility, corrosion, and other material compatibility studies and toxicological and health effects studies. A “treatability study” is not a means to commercially treat or dispose of hazardous waste.

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.

  • Working level (WL) means any combination of short-lived radon daughters in 1 liter of air that will result in the ultimate emission of 1.3E+5 MeV of potential alpha particle energy. The short-lived radon daughters are—for radon-222: polonium-218, lead-214, bismuth-214, and polonium-214; and for radon-220: polonium-216, lead-212, bismuth-212, and polonium-212.

  • Baseline Personnel Security Standard means the pre-employment controls for all civil servants, members of the Armed Forces, temporary staff and government contractors generally.

  • Transmission Reliability Margin or “TRM” shall mean the amount of transmission transfer capability necessary to provide reasonable assurance that the interconnected transmission network will be secure. TRM accounts for the inherent uncertainty in system conditions and the need for operating flexibility to ensure reliable system operation as system conditions change.

  • Cluster development means a contiguous cluster or

  • Metric means a) when referenced in the context of a Named User, the individual Named User category and type (and corresponding Named User definition setting for such Named User’s use rights) as further described in Section 2.1 hereof -and- b) when referenced in the context of a Package, the individual business metric corresponding with each Package as further described in Section 2.2 hereof;