Examples of System Element in a sentence
On or before the Owner's acceptance of the Facilities Preparation Services of any System Element Facility within any given PCS System in accordance with the terms of Exhibit B2, the Owner will have received details (in a form reasonably satisfactory to the Owner) of all invoices and charges for such Facilities Preparation Services incurred by the Vendor in connection with the Facilities Preparation Services for such System Element Facility.
Subject to subsection 2.12, during the course of the Work, the Vendor will perform the security services necessary to ensure the safety and security of the System Element Locations, the Products and/or other materials or designs relevant to the Work.
In the event that under the remedy provisions of this Section 17 the Vendor is required to provide additional MSC and/or Base Stations requiring additional System Element Locations, the Owner will be responsible for all Site Acquisition and Facilities Preparation Services costs (other than any construction management costs or fees which will be borne by the Vendor).
Title to each Item of Equipment (but in no case Software) will pass to the Owner upon delivery thereof by the Vendor to the System Element Location to which each such Item belongs or such other location specifically requested by the Owner or as otherwise mutually agreed to by the Parties.
The Build Notice calculation will be based upon the Owner's reasonable estimate of System Element Locations within or in connection with the Preliminary RF Design applicable to the PCS System and/or PCS Sub-System in which such Build Notice is issued to the Vendor.
To the extent the Vendor is in control of any System Element Location, or other site within the System or any System Area during the term of this Contract (a "Vendor-Controlled Location") including, but not limited to, during the build-out of the Initial System, the Vendor will be solely responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with all such Vendor-Controlled Locations.
Except during an Emergency or at the specific request of the Transmission Owner, Local Distribution Company shall not, without prior Transmission Owner authorization, operate any Transmission System Element including any circuits or related transformers, lines or busses.
In the event that Cingular experiences a CCF on a System Element in a redundant solution without causing any degrade of service for the end-user, this shall not be tracked in this report card.
All activities in Section A of this Exhibit B4 `Boltdown of BTS Equipment' must be successfully completed in order for the BTS System Element Location to be declared "Site Ready" for Commissioning.
Both cell and non-cell downtime will be measured per quarter per included System Element.