Tank test definition

Tank test means model towing tests, model self-propulsion tests and model propeller open water tests. Numerical calculations may be accepted as equivalent to model propeller open water tests or used to complement the tank tests conducted (e.g. to evaluate the effect of additional hull features such as fins, etc., on ship's performance), with approval of the verifier.
Tank test means model towing tests, model self-propulsion tests and model propeller open water tests. Numerical calculations may be accepted as equivalent to model propeller open water tests or used to complement the tank tests conducted (e.g. to evaluate the effect of additional hull features such as fins, etc. on ships' performance), or as a replacement for model tests provided that the methodology and numerical model used have been validated/calibrated against parent hull sea trials and/or model tests, with the approval of the verifier.
Tank test means model towing tests, model self-propulsion tests and model propeller open water tests. Numerical calculations may be accepted as equivalent to model propeller open water tests or used to complement the tank tests conducted (e.g. to evaluate the effect of additional hull features such as fins, etc. on ship's performance), with approval of the verifier." Rationale: Numerical calculations by use of Computational Fluid Dynamics – CFD – cannot replace a tank test. Firstly, CFD is not a uniform standard and different CFD software may produce very different results. Currently CFD is not sufficiently mature to replace a physical tank test of a model. CFD is an excellent tool for refining a defined model and for trim optimization, etc. CFD should only be allowed in cases where the full scale speed trials are carried out in the full load EEDI condition.

Examples of Tank test in a sentence

  • SubmitterVerifier Basic design, Tank test*, EEDI calculationWitness model Tank test Development of EEDI Technical File Start of ship construction Modification and resubmission of EEDI Technical File Delivery of ship Issuance of report of pre-verificationVerification:- EEDI Technical File- Additional informationIssuance of certificateVerification:- Sea trial condition- Ship speed- Revised EEDI Technical FileSea trialSubmission of additional information* To be conducted by a test organization or a submitter.

  • DELEFORTRIE, G., WILLEMS, M., LAFORCE, E., VANTORRE, M., DE MULDER, T., DE REGGE, J., WONG, J., Tank test of vessel entry and exit for third set of Panama locks, The Proceedings of the International Navigation Seminar following PIANC AGA 2008, China Communications Press, pp 517–530, 2008.

  • A gearbox is used to drive an induction generator, and a frequency converter, step up transformer andwet mate link complete the generating Deep GreenManufacturer: Minesto Type of device: E Other Status: Scale prototype Current location: Tank test Rating: 0.5MW system.

  • SubmitterVerifier Basic design, Tank test,* EEDI calculationWitness model Tank test Development of EEDI Technical File Start of ship construction Modification and resubmission of EEDI Technical File Delivery of ship Issuance of certificateVerification:- Sea trial condition- Ship speed- Revised EEDI Technical FileSea trialIssuance of report of pre-verificationVerification:- EEDI Technical File- Additional informationSubmission of additional information* To be conducted by a test organization or a submitter.

  • Power Tank test Results Sea Trial ResultsAdjusted speed by the Results of Sea trialShip SpeedTrial conditionEEDI conditionMCR NCR αP * EEDI powerEEDI power Figure 2: An example of scheme of conversion from trial condition to EEDI condition at EEDI power Note: Further consideration would be necessary for speed adjustment methodology in paragraph 4.3.9.2 of these guidelines.

  • Tank test records will be developed and documented in compliance with the requirements set out in the OPR, CSA Z662-11, and Enbridge’s Tank Hydrostatic Test Specifications CQS001 – 2006, Revision 0 and Tank Strapping Specification.

  • Power Tank test Results Sea Trial ResultsAdjusted speed by the Results of Sea trialShip SpeedTrial conditionEEDI conditionMCR NCR P * EEDI powerEEDI power Figure 2: An example of scheme of conversion from trial condition to EEDI condition at EEDI power Note: Further consideration would be necessary for speed adjustment methodology in paragraphs 4.3.9.2 to 4.3.9.4 of these Guidelines.

  • Tank test for structural ad- equacy is to be carried out to the satisfaction of the attending Surveyor.

  • Tank test results on a ship model is integrated to actual ship design.

  • However, the Department shall40 not reimburse expenses pursuant to this subdivision that exceed Medicare41 reimbursement rates.


More Definitions of Tank test

Tank test has the meaning given that term in Section 5.3.(e).

Related to Tank test

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Borrowing Base Test means a test that will be satisfied on any date of determination if the following is true: Where: AR =57%.

  • Coverage Tests means each of the Overcollateralization Ratio Test and the Interest Coverage Ratio Test.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Coverage Test means each of the Class A/B Par Value Test, the Class A/B Interest Coverage Test, the Class C Par Value Test, the Class C Interest Coverage Test, the Class D Par Value Test, the Class D Interest Coverage Test, the Class E Par Value Test and the Class E Interest Coverage Test.

  • Cannabis testing facility means an entity registered by

  • Asset Test means, for an Asset Review, each Test, as defined in the Asset Representations Review Agreement, in Schedule A to the Asset Representations Review Agreement to be performed by the Asset Representations Reviewer on the related Asset Review Receivables.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Collateral Quality Test A test satisfied as of the Effective Date and any other date thereafter on which such test is required to be determined hereunder if, in the aggregate, the Collateral Obligations owned (or in relation to a proposed purchase of a Collateral Obligation, both owned and proposed to be owned) by the Issuer satisfy each of the tests set forth below (or, after the Effective Date, if any such test is not satisfied at the time of reinvestment, the level of compliance with such test is maintained or improved as described in the Investment Criteria):

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Collateral Quality Tests means the Collateral Quality Tests set out in the Investment Management Agreement being each of the following:

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).