Time cycle definition

Time cycle means the film development time.
Time cycle means the film devel- opment time.
Time cycle means the filmdevelopment time.

Examples of Time cycle in a sentence

  • This is a procurement threshold relating to Life Time cycle of contracts.

  • Time cycle component replacement will be derived from specification and drawing requirements and included in periodic maintenance instructions, as required.

  • Time cycle criteria will be largely influenced by the driver of the test vehicle and the test vehicle itself.

  • NON-DEFAULTING LENDER" means each Lender which is not a Defaulting Lender.

  • Since most sciences use still a single, continuous space-time plane (Cartesian), a single, Absolute Time cycle (clock-time), a geometry of forms not of motions (Euclidean geometry), and a monist, A->B causal logic (Aristotelian Logic).

  • If it does not end correctly, a “Blast chilling duration outside limit“ alarm is generated and the display shows the message:Batch(number) Ot(blast chilling time) MIN Start Date Time End Date TimeEXAMPLE: BATCH1 Ot 120MIN Start 25-10-01 15.48 End 25-10-01 17.48.where:(number) indicates the current day’s batch number; Start Date Time indicates cycle start;End Date Time cycle end.

  • Time cycle variations shall not occur due to any change in outside temperature between the limits of 120°F below zero without the necessity of any heater elements.

  • The work cycle (daily) Start of Feedback day15 mins long break Figure 1: Time cycle orientation of the Pongo team Pomodoro (tomato) originally was a tomato-shaped kitchen timer the Pongo team used at the XP training laboratory.

  • Time cycle for one batch is 12 hrs with a monthly capacity of 60 batches.• NeutralizationNitromass is neutralized in M.S. rubber lined, brick lined vessel.

  • The target of these functions is to be both min- imised.• Time cycle - It is the sum of the time demanded for all the sequential tasksName Table 3.4: Evaluation functions.

Related to Time cycle

  • Hire Period means the period commencing when the Customer holds the Hire Goods on hire (including Saturdays Sundays and Bank Holidays) and ending upon the happening of any of the following events:

  • life cycle means all consecutive and/or interlinked stages, including research and development to be carried out, production, trading and its conditions, transport, use and maintenance, throughout the existence of the product or the works or the provision of the service, from raw material acquisition or generation of resources to disposal, clearance and end of service or utilisation;

  • Testing Period means a single period consisting of the four consecutive fiscal quarters of the Borrower then last ended (whether or not such quarters are all within the same fiscal year), except that if a particular provision of this Agreement indicates that a Testing Period shall be of a different specified duration, such Testing Period shall consist of the particular fiscal quarter or quarters then last ended that are so indicated in such provision.

  • Vesting Commencement Date means the Grant Date or such other date selected by the Committee as the date from which an Award begins to vest.

  • Service Period has the meaning given to it in Framework Schedule 4 (Template Order Form and Template Call Off Terms) as refined by a Contracting Body in a Call Off Agreement between that Contracting Body and the Supplier;

  • Vesting Period means the period of time specified by the Committee during which vesting restrictions for an Award are applicable.

  • Scheduled Completion Date shall be the date set forth in Clause 10.3;

  • Waiting Period shall have the meaning set forth in Section 2.2.

  • Award Period means the period beginning on an Award Date and ending on the expiration date of such Award.

  • Vesting Date has the meaning set forth in Section 3.10(c)(ii).

  • Peak Period means the time between 6 a.m. and 10 p.m. (April through September) or between 7a.m. and 11 p.m. (October through March) on all days except Saturdays and Sundays, which daily time period will be subject to change from time to time at the Company's option. This change would occur after no less than ten (10) days notice has been given to all Customers who would be affected, and to the Commission.

  • Net metering period means the 12-month period following the date of final interconnection of the