Transmission Interconnection Feasibility Study definition

Transmission Interconnection Feasibility Study means a study conducted by the Transmission Provider in accordance with Section 36.2 of the Tariff.
Transmission Interconnection Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part IV, section 36.
Transmission Interconnection Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part IV, section 36.2.

Examples of Transmission Interconnection Feasibility Study in a sentence

  • Either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • To be assigned a PJM Queue Position pursuant to Tariff, Part VI, Preamble, section 201, a Transmission Interconnection Customer must submit a complete and fully executed Transmission Interconnection Feasibility Study Agreement, a form of which is located in the Tariff, Attachment S.

  • To be assigned a PJM Queue Position pursuant to Section 201, a Transmission Interconnection Customer must submit a complete and fully executed Transmission Interconnection Feasibility Study Agreement, a form of which is located in the Tariff, Attachment S.

  • Interconnection Feasibility Study shall mean a preliminary evaluation of the system impact and cost of interconnecting the Generating Facility to the Transmission Interconnection Feasibility Study Agreement shall mean the form of agreement contained in Appendix 2 of the Standard Large Generator Interconnection Procedures for conducting the Interconnection Feasibility Study.

  • Each developer is encouraged to participate in the activities of the Transmission Expansion Advisory Committee and its Regional Transmission Expansion Plan (RTEP) Committee (PJM, 2009).In the first stage, a developer must submit an Interconnection Request in the form of an executed Generation or Transmission Interconnection Feasibility Study Agreement in addition to a study deposit.

  • The Generation Interconnection Feasibility Study, the Transmission Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Part IV of the Tariff.

  • The Board considered the independence of each of the above mentioned Directors in terms of Section 149 and Schedule IV to the Companies Act, 2013 and Clause 49 of the listing agreement and was of the view that the proposed directors fulfill the criteria of independence as mentioned in the above provisions and can be appointed as Independent Directors.

  • Complaint at 27 (citing Merchant Transmission Interconnection Feasibility Study Report for PJM Merchant Transmission Request AF1-200 (Jan.

  • Either“Interconnection Feasibility Study” shall mean either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

Related to Transmission Interconnection Feasibility Study

  • Transmission Interconnection Customer means an entity that submits an Interconnection Request to interconnect or add Merchant Transmission Facilities to the Transmission System or to increase the capacity of Merchant Transmission Facilities interconnected with the Transmission System in the PJM Region or an entity that submits an Upgrade Request for Merchant Network Upgrades (including accelerating the construction of any transmission enhancement or expansion, other than Merchant Transmission Facilities, that is included in the Regional Transmission Expansion Plan prepared pursuant to Operating Agreement, Schedule 6).

  • Transmission Owner Interconnection Facilities means all Interconnection Facilities that are not Customer Interconnection Facilities and that, after the transfer under Tariff, Attachment P, Appendix 2, section 5.5 to the Interconnected Transmission Owner of title to any Transmission Owner Interconnection Facilities that the Interconnection Customer constructed, are owned, controlled, operated and maintained by the Interconnected Transmission Owner on the Interconnected Transmission Owner’s side of the Point of Interconnection identified in appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System or interconnected distribution facilities. The “Transmission Provider” shall be the Office of the Interconnection for all purposes, provided that the Transmission Owners will have the responsibility for the following specified activities:

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.