Treatment Control BMP definition

Treatment Control BMP means any engineered system designed to remove pollutants by simple gravity settling of particulate pollutants, filtration, biological uptake, media adsorption or any other physical, biological, or chemical process.
Treatment Control BMP means any engineered system designed to remove pollut- ants by simple gravity settling of particulate pollutants, filtration, biological uptake, media absorption or any other physical, biological, or chemical process.
Treatment Control BMP means any engineered system designed and constructed to remove pollutants from urban runoff. Pollutant removal is achieved by simple gravity settling of particulate pollutants, filtration, biological uptake, media adsorption or any other physical, biological, or chemical process.

Examples of Treatment Control BMP in a sentence

  • For all properties, the verification will include the developer’s signed statement, as part of the project application, accepting responsibility for all structural and treatment control BMP maintenance until the time the property is transferred and, where applicable, a signed agreement from the public or private entity assuming responsibility for Structural or Treatment Control BMP maintenance.

  • The transfer of property to a private or public owner shall have conditions requiring the recipient to assume responsibility for maintenance of any Structural or Treatment Control BMP included in the sales or lease agreement for that property.

  • Treatment Control BMP ImplementationThe primary treatment control BMP used by most projects is the infiltration pit.

  • Treatment Control BMP ImplementationThe City has approved a wide range of treatment control BMPs for both discretionary and ministerial projects.

  • Multiple Priority Development Projects may share Treatment Control BMPs as long as construction of any shared Treatment Control BMP is completed prior to the use of any development project from which the Treatment Control BMP will receive Urban Runoff, and prior to discharge to a Receiving Water.

  • Treatment Control BMP ImplementationThe field evaluation team visited a school construction site and three commercial parking lots (two completed, one under construction).

  • For all properties, the verification will include the developer’s signed statement, as part of the project application, accepting responsibility for all structural and treatment control BMP maintenance until the time the property is transferred and, where applicable, a signed agreement from the public entity assuming responsibility for Structural or Treatment Control BMP maintenance.

  • For any identified pollutants of concern not listed in the Treatment Control BMP Selection Matrix, provide an explanation of how they will be addressed by Treatment Control BMPs. For identified pollutants of concern that are causing an impairment in receiving waters (as identified in Section 2.1, above), the project WQMP shall incorporate one or more Treatment Control BMPs of medium or high effectiveness in reducing those pollutants.

  • All trash container areas shall meet the following Structural or Treatment Control BMP requirements (individual single family residences are exempt from these requirements): • Trash container areas shall have drainage from adjoining roofs and pavement diverted around the area(s).• Trash container areas shall be screened or walled to prevent off-site transport of trash.

  • The transfer of property to a private or public owner must have conditions requiring the recipient to assume responsibility for maintenance of any Structural or Treatment Control BMP to be included in the sales or lease agreement for that property, and will be the owner’s responsibility.

Related to Treatment Control BMP

  • Management Control means the possession, directly or indirectly of the power to direct or cause the direction of the management and policies of the Concessionaire, whether through the ownership of voting securities, by contract or otherwise or the power to elect or appoint more than 50% (fifty percent) of the directors, managers, partners or other individuals exercising similar authority with respect to the Concessionaire.

  • Treatment site means the anatomical description of the tissue intended to receive a radiation dose, as described in a written directive.

  • Joint Control means a situation where a company has multiple promoters (but none of the shareholders has more than 50% of voting rights and paid up share capital).

  • Treatment facility means an institution (or distinct part thereof) for the treatment of alcoholism or drug abuse, which meets fully every one of the following tests:

  • Treatment means any method, technique, or process, including neutralization, designed to change the physical, chemical, or biological character or composition of any hazardous waste so as to neutralize such waste, or so as to recover energy or material resources from the waste, or so as to render such waste non-hazardous, or less hazardous; safer to transport, store, or dispose of; or amenable for recovery, amenable for storage, or reduced in volume.

  • Erosion and sediment control plan or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.

  • Treatment Plant means the onshore plant to be constructed by the Joint Venturers for the liquefaction and treatment of natural gas and condensate as contemplated in the recitals to this Agreement.

  • Treatment plan means a written agreement between the department and the parent or

  • Treatment program means an abstinence based program or facility that is accredited by any of the following:

  • Wastewater treatment facility means a treatment works, as

  • Treatment zone means a soil area of the unsaturated zone of a land treatment unit within which hazardous constituents are degraded, transformed, or immobilized.

  • Account Control Agreement(s) means any agreement entered into by and among the Agent, Borrower and a third party bank or other institution (including a Securities Intermediary) in which Borrower maintains a Deposit Account or an account holding Investment Property and which perfects Agent’s first priority security interest in the subject account or accounts.

  • Non-Administrator Substance Use Disorder Treatment Facility means a Substance Use Disorder Treatment Facility that does not meet the definition of an Administrator Substance Use Disorder Treatment Facility.

  • Account Control Agreement means the Account Control Agreement among the Borrower, as debtor, the Collateral Agent, as secured party, and State Street Bank and Trust Company, as depository bank and Securities Intermediary, dated on or about the date hereof.

  • Wastewater treatment system means any equipment, plants,

  • Management Contract means the contract executed between the treasurer and a program manager.

  • Wastewater treatment plant means a facility designed and constructed to receive, treat, or store waterborne or liquid wastes.

  • Wastewater treatment tank means a tank that is designed to receive and treat an influent wastewater through physical, chemical, or biological methods.

  • Wastewater Treatment Works means an arrangement of devices and structures for treating wastewater, industrial wastes, and sludge. Sometimes used as synonymous with "waste treatment plant" or "wastewater treatment plant" or "pollution control plant".

  • Credit Control means all the functions relating to the collection of monies owed by ratepayers and the users of municipal services.

  • Critical control point means a point, step, or procedure in a food proc- ess at which control can be applied, and a food safety hazard can as a result be prevented, eliminated, or reduced to acceptable levels.

  • Treatment works means any devices and systems used in storage, treatment, recycling, and reclamation of municipal sewage and industrial wastes, of a liquid nature to implement section 201 of the Act, or necessary to recycle reuse water at the most economic cost over the estimated life of the works, including intercepting sewers, sewage collection systems, pumping, power and other equipment, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities, and any works, including site acquisition of the land that will be an integral part of the treatment process or is used for ultimate disposal of residues resulting from such treatment.

  • Monitoring RTO means the Party that has operational control of a M2M Flowgate.

  • Joint Controllers means where two or more Controllers jointly determine the purposes and means of processing;

  • Substance abuse treatment means outpatient or inpatient services or participation in Alcoholics Anonymous or a similar program.

  • Evaluation and treatment facility means any facility which