Validation of PEMS definition

Validation of PEMS means the process of evaluating on a chassis dynamometer the correct installation and functionality within the given accuracy limits of a Portable Emissions Measurement System and exhaust mass flow rate measurements as obtained from one or multiple non-traceable exhaust mass flow meters or as calculated from sensors or ECU signals.
Validation of PEMS means the process of evaluating the correct installation and functionality of a Portable Emissions Measurement System and the correctness of exhaust mass flow rate measurements as obtained from one or multiple non-traceable exhaust mass flow meters or as calculated from sensors or ECU signals.

Examples of Validation of PEMS in a sentence

  • Table A5/4 Accuracy requirements for measurement parameters Fuel flow19 ± 1 % of reading20 Air flow21 ± 2 % of reading Vehicle speed22 ± 1.0 km/h absolute Temperatures ≤600 K ± 2 K absolute Temperatures >600 K ± 0.4 % of reading in Kelvin Ambient pressure ± 0.2 kPa absolute Relative humidity ± 5 % absolute Absolute humidity ± 10 % of reading or, 1 gH2O/kg dry air, whichever is larger Annex 6 Validation of PEMS and non-traceable exhaust mass flow rate1.

  • Appendix 3 Validation of PEMS and non-traceable exhaust mass flow rate 1.

  • Validation of PEMS" means the process of evaluating the correct installation and functionality of a Portable Emissions Measurement System and the correctness of exhaust mass flow rate measurements as obtained from one or multiple non-traceable exhaust mass flow meters or as calculated from sensors or ECU signals.

  • Appendix 3 Validation of PEMS and non-traceable exhaust mass flow rate1.

  • Validation of PEMS" means the process of evaluating on a chassis dynamometer the correct installation and functionality within the given accuracy limits of a Portable Emissions Measurement System and exhaust mass flow rate measurements as obtained from one or multiple non-traceable exhaust mass flow meters or as calculated from sensors or ECU signals.

  • The grounds upon which covenants may be overridden is detailed in local plans.

Related to Validation of PEMS

  • Implementation means the activity between formal approval of an E911 service plan and a given system design, and commencement of operations.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Staff Vetting Procedure means the Authority’s procedures for the vetting of personnel and as advised to the Contractor by the Authority.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Commencement of Construction means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • QAP shall have the meaning set forth in Clause 11.2;

  • Protocol means, in respect of any category of object and associated rights to which this Convention applies, the Protocol in respect of that category of object and associated rights;

  • Construction Change Directive means an approved change in the Work issued by the Owner without the complete agreement of Contractor as to cost and/or time.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Technical safeguards means the technology and the policy and procedures for its use that 27 protect electronic PHI and control access to it.

  • Complications of Pregnancy means conditions whose diagnoses are distinct from pregnancy but are adversely affected by pregnancy or are caused by pregnancy. These conditions include acute nephritis, nephrosis, cardiac decompensation, missed abortion and similar medical and surgical conditions of comparable severity. Complications of pregnancy also include nonelective cesarean section, ectopic pregnancy which is terminated and spontaneous termination of pregnancy, which occurs during a period of gestation in which a viable birth is not possible.

  • pseudonymisation means the processing of personal data in such a manner that the personal data can no longer be attributed to a specific data subject without the use of additional information, provided that such additional information is kept separately and is subject to technical and organisational measures to ensure that the personal data are not attributed to an identified or identifiable natural person;

  • Safety Convention means the International Convention for the Safety of Life at Sea, 1974 (a copy of the English text of the articles of which, and of part of the annex to which, is set forth in Schedule 4), as affected by any amendment, other than an amendment objected to by Australia, made under Article VIII of that Convention and, after the date on which the Protocol of 1978 relating to the Safety Convention enters into force for Australia, as also affected by that Protocol;

  • Quality Agreement has the meaning set forth in Section 9.6.

  • Diagnostic clinical procedures manual means a collection of written procedures that describes each method (and other instructions and precautions) by which the licensee performs diagnostic clinical procedures; where each diagnostic clinical procedure has been approved by the authorized user and includes the radiopharmaceutical, dosage, and route of administration.